Accela 600 Pump or Accela 1250 Pump Installation
Accela Pump Installation Checklist
12
Accela 600 and 1250 Pump Hardware Manual
Thermo Scientific
Accela Pump Installation Checklist
When the Accela pump (600 or 1250) arrives at your facility, a Thermo Fisher Scientific field
service engineer performs the initial installation. When you move the pump from one
location to another, follow the steps in this installation checklist to ensure that the Accela
pump operates properly as part of an Accela LC system.
This installation checklist summarizes the steps that must be completed to properly install the
Accela pump:
Unpack and inspect your instrument (see
Position the Accela pump appropriately on the benchtop (see
).
Make the back panel connections (see system installation procedures or
the Pump to the Data System Computer”
Connect the solvent lines (see
Connect the power cord and turn on the instrument (see
).
Add the Accela pump to the instrument configuration for the data system (see
).
This Accela pump was installed by:
(Name)
(Date)