15
SIZING THE DUCT WORK FOR A COMBINATION HEATING AND COOLING SYSTEM:
Two formulas must be used in determining the CFM requirements of a combustion heating and cooling
system.
1. HEATING CFM:
HEAT OUTPUT OF FURNACE (BTUH)
1.1 X TR (TEMPERATURE RISE, °F) =
HEATING(CFM)
EXAMPLES:
A. 110,000 BTUH OUTPUT
1.1 X 85°F TR = 1176 CFM FOR HEATING
B. 110,000 BTUH OUTPUT
1.1 X 70°F TR = 1429 CFM FOR HEATING
2. COOLING CFM: 400 CFM X COOLING TONNAGE (12,000 BTUH PER TON)=AIRFLOW FOR
COOLING(CFM)
EXAMPLES:
A. 400 CFM X 3 TON (12,000 BTUH) = 1,200 CFM FOR COOLING
1TON
B. 400 CFM X 2.5 TON (12,000 BTUH) = 1,000 CFM FOR COOLING
1 TON
IMPORTANT: SIZE THE DUCT SYSTEM FOR THE LARGER OF THE TWO AIRFLOW
REQUIREMENTS.
E. Air Filter Mounted External to Furnace:
On
highboy
furnaces, it is necessary to cut the return air opening in the side, rear casing or base,
depending upon the needs of the specific installation.
The filter rack provided with the furnace, refer to Fig. 10a & 10b, will serve as a template to scribe a mark
for the return air opening on the casing. Place the filter rack on a side casing approximately one inch up
from the bottom of the furnace and centered from side to side. Place the securing flange against the
casing when locating the return air opening. For your convenience, (4) locator knockouts have been
placed at the proper locations on both the left and right side casings.
PLEASE NOTE:
While scribing the return air opening, the filter rack can be held in position by tape or
similar temporary means.
Position the open end of the filter rack so as to provide access for filter replacement. Once the filter rack
is positioned correctly, scribe a line along the inside of the securing flange on three of the sides. To scribe
a line on the fourth side (the open end), use the open-end support as a guide.
Remove the filter rack and cut the return air opening in the casing. Now the filter rack can be anchored to
the furnace with screws or pop-rivets through the securing flange of the filter rack.
Содержание Thermo Pride OH6FA072D48B
Страница 5: ...2...
Страница 33: ...30 Heating Speed Set ups 2 Stage OH6FX072DV4 Figure 18 2 ECM 2 stage blower motor speed chart...
Страница 64: ...61 VIII Sequence of Operations Flow Chart...
Страница 65: ...62...
Страница 66: ...63 IX Trouble Shooting Flow Chart...
Страница 67: ...64...
Страница 68: ...65...
Страница 69: ...66...
Страница 70: ...67...
Страница 72: ...69 Appendix A Replacement Parts Replacement Parts for OH6FA072D...
Страница 73: ...70 Replacement Parts for OH8FA119D...
Страница 74: ...71 Appendix B Wiring Diagrams OH6FA072D48 PSC Wiring Diagram...
Страница 75: ...72 OH6FA072DV4 ECM Wiring Diagram...
Страница 76: ...73 OH6FX072DV4 ECM 2 Stage Wiring Diagram...
Страница 77: ...74 OH8FA1119D60 PSC Wiring Diagram...
Страница 78: ...75 OH8FA1119DV5 ECM Wiring Diagram...
Страница 79: ...76...