All installations and services must be performed by qualified service personnel.
18
A. 400 CFM X 3 TON (36,000 BTU'S) = 1,200 CFM FOR COOLING
B. 400 CFM X 2.5 TON (30,000 BTU'S) = 1,000 CFM FOR COOLING
NOTE:
To obtain the proper 50°F to 80°F temperature rise for heating an air conditioning coil is installed, the speed
of the blower motor may have to be changed. This depends on the static resistance of an individual duct system and
the size of the air conditioner.
M. FILTERS
To clean a dirty filter, first remove the blower compartment door. Remove dirty filter from the filter rack and clean
with a mild soap and water solution. Make sure filter is thoroughly dry before replacing. Put blower compartment
door back into place.
A. PGT HORIZONTAL UNITS
B. PGL LOWBOY
Содержание PGL20-180
Страница 24: ...All installations and services must be performed by qualified service personnel 22...
Страница 25: ...All installations and services must be performed by qualified service personnel 23...
Страница 26: ...All installations and services must be performed by qualified service personnel 24...
Страница 27: ...All installations and services must be performed by qualified service personnel 25...
Страница 34: ...All installations and services must be performed by qualified service personnel 32 VII REPLACEMENT PARTS...
Страница 35: ...All installations and services must be performed by qualified service personnel 33...
Страница 36: ...All installations and services must be performed by qualified service personnel 34...
Страница 37: ...All installations and services must be performed by qualified service personnel 35...
Страница 38: ...All installations and services must be performed by qualified service personnel 36...