
All installations and services must be performed by qualified service personnel.
31
BLOWER DELAY SETTINGS
To delay fan
turn-on by:
Set Switch
#1 #2
15 sec.
30 sec.
*45 sec.
60 sec,
Off Off
Off On
On Off
On On
To delay fan
turn-off by:
Set Switch
#3 #4
60 sec.
90 sec.
*120 sec.
180 sec.
On On
Off On
On Off
Off Off
*Factory Settings For Optimal Performance
5. FIELD WIRING AND REPLACING WIRING
Field wiring between the furnace and devices not attached to the furnace shall conform with the
temperature limitation for Type T wire [63°F rise (35°C)] when installed with the manufacturers
instructions. If any of the original factory supplied furnace wiring is replaced or a separate device other
than the thermostat is wired internal to the unit 105
°
C thermoplastic or equivalent wire must be used.
Содержание CDB1-100N
Страница 54: ...All installations and services must be performed by qualified service personnel 48 ...
Страница 56: ...All installations and services must be performed by qualified service personnel 50 ...
Страница 57: ...All installations and services must be performed by qualified service personnel 51 Appendix B Wiring Diagrams ...
Страница 58: ...All installations and services must be performed by qualified service personnel 52 ...