
All installations and services must be performed by qualified service personnel.
8
Figure 1
The horizontal furnace installation should be on a service platform large enough to allow for proper
clearances on all sides and service access to the front of the furnace (See Table 1). If the furnace is
suspended, it must be supported at both ends and in the middle with clearance allowed for removal of
both access doors. Gas supply line contact is only permissible between lines
formed by the intersection of
the top and two sides of the furnaces casing and the building joists, studs, or framing (See Figure 1).
Equipment must be installed in accordance with regulations of the National Board of Fire
Underwriters and the National Fuel Gas Code. Authorities having jurisdiction should be consulted
before installations are made.
C. REPLACING AN EXISTING FURNACE FROM A COMMON VENT
: These furnaces may not be common vented with any other appliance.
Содержание CDB1-100N
Страница 54: ...All installations and services must be performed by qualified service personnel 48 ...
Страница 56: ...All installations and services must be performed by qualified service personnel 50 ...
Страница 57: ...All installations and services must be performed by qualified service personnel 51 Appendix B Wiring Diagrams ...
Страница 58: ...All installations and services must be performed by qualified service personnel 52 ...