ALL INSTALLATIONS AND SERVICE MUST BE PERFORMED BY QUALIFIED SERVICE PERSONNEL.

 

 
This termination vent/combustion air kit is for horizontal or vertical venting of Thermo 
Pride's condensing gas furnaces.  This kit is designed for extreme cold conditions when 
traditional combustion air intakes may frost over causing nuisance shut downs of the 
furnace.  In addition to cold weather applications, this kit may also be utilized in other 
sidewall vent applications where a single hole through the foundation or basement wall 
is desired.   
 
The following parts are included in the termination kit. 
 

ITEM DESCRIPTION 

 

AOPS7488  2” KIT 

AOPS7489  3” KIT  

2” Rain Cap 

3” Rain Cap 

3" dia x 19-1/2” long, SDR-26 pipe 

4" dia x 24” long, SDR-26 pipe  

2" dia x 31-5/8” long, SDR-26 Pipe 

2-1/2" dia x 37-1/8” long, SDR-26 pipe 

2” Wye Fitting 

3” Wye Fitting 

 

Assembled Concentric Vent Kit 

(2” Kit shown)

 

 

WYE FITTING

RAIN CAP

OUTER PIPE

INNER PIPE

FIG-1

 
       Follow the furnace installation instructions for locating the furnace, clearances, 

operation and safety procedures.  Use these instructions for installation of the 
concentric vent termination kit.  Read these instructions completely before 
attempting installation.  Field supplied pipe and fittings are required to complete 
installation. 

 

Vent Termination Clearances 
 
 

Determine termination locations based on clearances specified in furnace 
installation instructions.  The vent termination must be located at least 12” above 
ground or normally expected snow accumulation levels. 

 

 

Содержание AOPS7488

Страница 1: ...intended for use by a qualified service technician familiar with safety procedures and equipped with the proper tools and test instruments ELECTRIC SHOCK HAZARD FIRE AND OR EXPLOSION HAZARD Failure t...

Страница 2: ...in Cap 3 Rain Cap 2 3 dia x 19 1 2 long SDR 26 pipe 4 dia x 24 long SDR 26 pipe 3 2 dia x 31 5 8 long SDR 26 Pipe 2 1 2 dia x 37 1 8 long SDR 26 pipe 4 2 Wye Fitting 3 Wye Fitting Assembled Concentric...

Страница 3: ...oof termination is preferred since it is less susceptible to damage has reduced intake contaminants and less visible vent vapor For side wall termination consideration should be given to A possible da...

Страница 4: ...ALL INSTALLATIONS AND SERVICE MUST BE PERFORMED BY QUALIFIED SERVICE PERSONNEL VERETICAL TERMINATION HORIZONTAL TERMINATION 4...

Страница 5: ...ALL INSTALLATIONS AND SERVICE MUST BE PERFORMED BY QUALIFIED SERVICE PERSONNEL 2 CONCENTRIC VENT KIT AOPS7488 5...

Страница 6: ...ALL INSTALLATIONS AND SERVICE MUST BE PERFORMED BY QUALIFIED SERVICE PERSONNEL 3 CONCENTRIC VENT KIT AOPS7489 6...

Страница 7: ...r pipe instead of cementing when field disassembly is desired for cleaning see Fig 7 WYE FITTING FIG 5 FIG 6 OUTER PVC PIPE RAIN CAP INNER PVC PIPE APPLY PVC CEMENT THIS END FIG 7 STAINLESS STEEL SCRE...

Страница 8: ...the structure s hole 7 Secure the assembly to the structure as shown in Fig 2 or Fig 3 using field supplied metal strapping or equivalent material NOTE Ensure the termination height is above the roof...

Отзывы: