TEST PROCEDURE
To properly test the solar output you must have the following items:
•
Halogen lamp (500W or greater) or be outdoors in the daylight
•
Voltage meter
•
Ammeter
1. Put voltmeter on the battery and measure the voltage.
•
Voltage must be less than 12.8 V for the solar panel controller to turn on.
•
If battery voltage is not less than 12.8 V then put a 12 V load on the battery.
2. If indoors, put at least a 500 W halogen lamp approximately 600 mm above the solar panel and
turn it on.
3. Put Ammeter around the positive cable from the solar panel.
•
Voltage reading should begin increasing or stay the same.
•
Amperage reading should be greater than 0.300 mA.
NOTE: The solar panel controller may take up to a minute to turn on. The solar panel must be
connected to the battery in order to turn on the charge controller.
Содержание ThermoLite T-Series
Страница 2: ...2 Figure 2 Solar Panel Kit Contents pictorial...
Страница 8: ...8 Figure 7 Trailer Unit Shown Being Tested T Series Truck Similar...
Страница 11: ......
Страница 12: ......