31
Electrical Maintenance
AUSTRALIAN BOSCH ALTERNATOR
NOTE: Units manufactured with CYCLE-SENTRY and
alternators with integral regulators MUST use replace-
ment alternators with integral regulators.
CAUTION: Full-fielding alternators with the
integral regulator is accomplished by installing a
jumper from terminal F2 to ground. Attempting to
full-field the alternator by applying battery voltage
to terminal F2 will cause voltage regulator failure.
CAUTION: The F15 fuse must be removed from the
relay board on units equipped with the Australian
Bosch alternator. The voltage regulator will be dam-
aged if the unit is turned ON with the F15 fuse in
place on the relay board.
1.
Check Point for 2A Amperage
3.
Check Point for Sense Circuit and
Excitation Circuit Voltages
2.
Check Point for B+ Voltage
4.
Position for Full Fielding Jumper
Содержание SB-190 30
Страница 4: ......
Страница 8: ......
Страница 14: ...4...
Страница 26: ...Unit Description Rev 12 03 16 Front View AJA890...
Страница 27: ...Unit Description Rev 12 03 17 1 Defrost Damper 2 X430L Compressor 3 se 2 2 Engine Back View 1 2 3 AJA894...
Страница 30: ...Unit Description Rev 12 03 20 ARA158 1 DAS Optional 2 Relay Board 3 Microprocessor Control Box Components 1 2 3...
Страница 40: ...Operating Instructions Rev 12 03 30...
Страница 74: ...64...
Страница 92: ...82...
Страница 100: ...90...
Страница 113: ...103 SB 100 190 Schematic Diagram Page 1 of 2...
Страница 114: ...104 SB 100 190 Schematic Diagram Page 2 of 2...
Страница 115: ...105 SB 100 190 Wiring Diagram Page 1 of 5...
Страница 116: ...106 SB 100 190 Wiring Diagram Page 2 of 5...
Страница 117: ...107 SB 100 190 Wiring Diagram Page 3 of 5...
Страница 118: ...108 SB 100 190 Wiring Diagram Page 4 of 5...
Страница 119: ...109 SB 100 190 Wiring Diagram Page 5 of 5...