Thermo-Dynamics Boiler TDE-10 Скачать руководство пользователя страница 7

3

9. Circuit breaker size is 60 amps per 

heater circuit and 15 amps for the
circulator pump and control circuit.
The 24 volt control circuit is pro-
tected with a 2 amp ferrule fuse.

10. An opening is provided in the cabi-

net lower right hand corner of the
boiler for input wiring. All wiring
must be in accordance with local
electric code, or the National
Electric Code in the absence of a
local code.

Warning:  DISCONNECT ALL

WIRING AT THE MAIN SWITCH

BEFORE WIRING UNIT

11. Connect power to terminals marked 

L1 and L2 and the neutral leg of the
three wire service to the terminal
marked N (neutral).

12. Connect a ground wire to the case 

ground connection and connect the
ground wire to a ground that meets
local electrical codes. Improper
grounds may result in unsafe con-
ditions and interfere with other
electronic devices.

13. Replace boiler jacket and re-install 

assembly screws. Remove the door
holding screw to allow the door to
be opened.

Re-install the door holding screw when
the system is operating to avoid acci-
dental or unintentional opening of the
door.

14. Install the thermostat (not included) 

in accordance with the instructions 
provided by the manufacturer.

Caution:  The Thermostat, ground wire
and power wires are the only connec-
tions that should be made to the TDE.
Do not supply power to any other sys-
tem components from the TDE.

OPERATION

Caution:  Follow the start-up procedure
carefully and completely. Failure to fol-
low the start-up procedure may cause
damage to components including the
heater elements.

START-UP

1. Verify that the supply breaker at the 

main circuit breaker panel to the
TDE and all of the TDE electrical
breakers are in the off position.

NEVER PUT ELECTRICAL POWER TO

BOILER UNLESS BOILER AND 

HYDRONIC SYSTEM ARE 

FULL OF WATER.

2. Fill the hydronic system and the 

boiler. Purge all air from the system
at the purge valve. If it is a multi-
zone system, air purge each system.

3. Turn the supply breaker in the Main 

Circuit panel for 120 volt power to
the TDE to on. Turn the 15 amp
breaker in the TDE to on. DO NOT
ENERGIZE THE HEATER CIRCUITS.
The 15 amp breaker provides power
to the circulator and the controls.
Turn the thermostat up until it turns
the circulator on. If multiple zone
circulators are installed, turn the
zone circulators on. Continue to
vent the system with the circulators
running, until all air is purged.

4. The pressure gauge should read 12

psi if an automatic feed valve is

Содержание TDE-10

Страница 1: ...nance Manual Thermo Dynamics Boiler Company ROUTE 61 P O BOX 325 SCHUYLKILL HAVEN PA 17972 570 385 0731 FAX 570 385 5304 THERMO DYNAMICS Electric Boiler A Compact Versatile Easy to Use Heat Source for Forced Hot Water Systems ...

Страница 2: ...quiet operation of the TDE electric boiler ENERGY EFFICIENT With Thermo Dynamic s unique flow control system the TDE electric boiler delivers a steady flow of healthful heat using a minimal amount of electricity Low watt density heating elements low voltage thermostat and thorough insulation for minimum heat loss are just a few design features built in to deliver more comfort for every energy doll...

Страница 3: ...r conversion projects A Summary of Product Features Five models 10 kw to 30 kw One piece steel boiler shell Easily accessible controls Low voltage thermostat Heats single or multi zone systems Heat process water used in a manufacturing process Boiler Cabinet easily removes before or after piping unit to system UL Listed as central heating boiler Circulator piped and wired at factory 10 Year plus 1...

Страница 4: ...ACTERISTICS 120 240 VOLTS A C 3 WIRE SINGLE PHASE 60 HZ Net ratings are based on installed radiation of sufficient quantity to serve the requirements of the building and nothing need be added for normal piping and pick up Net rating is based on a piping and pick up allowance of 13 Dimensions Equipment Steel boiler jacket insulation controls and circulator Factory Installed ASME relief valve temper...

Страница 5: ...he brand names specified If another brand is used see the manufacturer s instructions for installation Installation of the Thermo Dynamics TDE electric boiler requires an expe rienced and trained service person The TDE is similar to an oil or gas fired boiler in many ways The differences are important Follow the installation instructions carefully to avoid problems Contact Thermo Dynamics if you h...

Страница 6: ...r indicates water flow direction 5 An Expansion Tank Not Provided must be matched to the system and installed in accordance with the manufacturer s recommendations A conventional expansion type of tank may be connected to the 1 2 NPT fitting in the boiler top If a pressure type tank is used the 1 2 opening must be plugged See the manufacturer s instructions for siz ing the expansion tank Do not un...

Страница 7: ...dance with the instructions provided by the manufacturer Caution The Thermostat ground wire and power wires are the only connec tions that should be made to the TDE Do not supply power to any other sys tem components from the TDE OPERATION Caution Follow the start up procedure carefully and completely Failure to fol low the start up procedure may cause damage to components including the heater ele...

Страница 8: ...the man ufacturers directions if so equipped When installation is complete and the system is operating satisfac torily close the cabinet door and re install the door holding screw to prevent accidental or uninten tional opening of the door SEQUENCE OF OPERATION The thermostat closes on a call for heat and energizes the circulator relay and the first heater relay which pulls in the circulator and t...

Страница 9: ...y that the system is leak free to prevent introduction of air dur ing operation Staging The TDE 15 20 25 and 30 can be staged using a second thermostat or a dual thermostat Staging may be a valuable feature if the user s electric bill is based on peak demand Staging pre vents the timed elements from energiz ing unless the temperature set point of a second or third thermostat is reached A careful h...

Страница 10: ...t 3 4 NPT FOR RELIEF VALVE FACTORY INSALLED 3 4 DRAIN VALVE FACTORY INSALLED 1 1 4 NPT FOR SYSTEM SUPPLY PRESSURE TEMPERATURE GAUGE THERMOSTAT WIRING ACCESS NAMEPLATE RATING PLATE 3 8 DIA MOUNTING HOLES 4 ELECTRICAL WIRING ACCESS 1 1 4 NPT FOR WATER SUPPLY COLD WATER RETURN 1 8 NPT FOR AIR VENT FIELD INSTALLED 1 2 NPT FOR FIELD CONNECTION TO CONVENTIONAL EXPANSION TANK NOTE 1 11 3 4 2 3 4 4 7 8 2 ...

Страница 11: ...7 ...

Страница 12: ...8 ...

Страница 13: ...9 ...

Страница 14: ...10 ...

Страница 15: ...11 ...

Страница 16: ...12 ...

Страница 17: ...13 PIPING DIAGRAM DIAPHRAGM TYPE EXPANSION TANK PIPING DIAGRAM CONVENTIONAL EXPANSION TANK TDE TDE ...

Страница 18: ...14 ...

Страница 19: ...s Split Power Supply Wire Sizes AWG Copper Model 10 15 20 25 30 N 14 14 14 14 14 Circuit 1 L1 6 6 6 6 6 L2 6 6 6 6 6 L1 8 6 6 6 Circuit 2 L2 8 6 6 6 L1 8 6 Circuit 3 L2 8 6 Equipment GRD 6 6 6 6 6 Model 10 15 20 25 30 Wire Size 6 4 2 1 00 Single Power Supply ...

Страница 20: ...ing from freezing excessive pressure temperature or leaks at water connec tions or any similar cause 7 Any installation that has been modified neglected altered tampered with vandalized misused subjected to accident fire flood or other casualty 8 Installations for which a heat balance provided by an experienced heating professional indicates that the boiler is inadequate for the application This w...

Отзывы: