26
CHECKS
On completion of the installation, perform the checks listed in the table below.
DESCRIPTION
OK
All automatic or manual filling pumps removed.
Safety valve calibrated to 6 bar, and flow open.
Drain pipe from safety valve routed suitably.
Expansion vessel correctly located and pre-charged to 2.5 bar
Содержание MODEX ACS 40 E
Страница 27: ......