background image

DOC NO. 81078 

Page 6 of 18 

Rev D 3/06 GM 

Requirements For Proper Installation 

 
 
1.  Ensure the steam room to be used is vapor proof. It should have a vapor proof door that seals well so 

the steam does not escape. Make sure the walls, ceiling and floor materials are suitable for use with 
steam and hot condensation, the steam produces. 

 

2.  Unit may be installed up to 50 feet away from steam room in a dry well ventilated area. 
 
3.  Use copper or brass fittings only 

(NEVER USE GALVANIZED FITTINGS).

 

 
4.  The water inlet uses 3/8” NPT and steam outlet uses 1/2" NPT for easy installation. 
 
5.  The generator must be upright, accessible and on a level surface with all connections on top.  Access 

panel and powerflush valve must be unobstructed and allow for easy access (see Figure 1). 

 
6.  Place a drain/spill pan under the unit. Plumb the connection on it to an approved drain. 
 
7.  Connect a tee to the cold water line. Install copper pipe to the tee (see Figure 3). 
 
8.  Install a brass shut-off valve on the water inlet line in an accessible area prior to the brass union and 

recommended in-line water filter. 

 
9.  Before making the last connection to the 3/8” NPT, flush the water line into a five-gallon pail to 

remove any silt or other materials that may be in the line. 

 
10.  Make the final connection and turn on water. All ThermaSol generators are equipped with an 

automatic water fill system. The water will stop after unit is filled. 

 
11.  The steam line can run up, down, or horizontal;

 but cannot run down and then up

. If it does, a 

steam trap will be produced at the low point blocking the flow of steam. 

Do not

 plumb a trap in the 

steam line. Insulate the steam outlet piping if the piping run exceeds 10 feet or is exposed to cold 
areas.

 Note:  Use steam rated insulation.

 

 

12. 

Do not

 plumb the pressure relief valve into the steam line. 

Plumbing the pressure relief valve into 

the steam line can be hazardous, should the steam outlet be capped off or obstructed.

 

 

13.  Pitch/angle steam line back towards generator and avoid perfectly level plumbed lines. 
 
14.  Make sure water is turned on before operating the unit. 
 
 

Note:  Failure to follow installation instructions specifically will cause the warranty to be void. 

 

Sizing Your Steam Room 

 
 

Factory Sized:

 L x W x H = Cubic Feet

 

Then choose the appropriate Model. No complicated 
formulas. It’s that simple. For every foot of ceiling 
height over 8 ft. (always round up) use the next larger 
steam unit. Wall material irrelevant.  

Generator 

Model 

Factory Sized 

Cu Ft MAX 

K

SS-Acrylic 

Acrylic Insert 

3.5

SS-84 84 

6.0

SS-140 140 

8.0

SS-240 240 

10 

SS-395 395 

12 

SS-600 500 

15 

 

 

 
 

Содержание SS-140

Страница 1: ...HERMASOL UNIT WITHOUT CONSULTING WITH YOUR ALLERGIST OR DOCTOR BEFORE USE THESE PRODUCTS MAY BE HAZARDOUS TO YOUR HEALTH YOUR SHOWER MAY BE A SLIP AND FALL HAZARD CHECK WITH YOUR CONTRACTOR OR FLOORING MANUFACTURER REGARDING THE SAFE USE OF YOUR FLOORING IN A STEAM APPLICATION SLIPPING AND FALLING INTO THE STEAMHEAD ITSELF OR INTO THE STREAM OF STEAM EMITTING FROM THE STEAMHEAD WILL CAUSE SERIOUS ...

Страница 2: ...age 2 of 18 Rev D 3 06 GM NOTICE WARNING LABEL THERMASOL CONTROL THERMASOL STEAMHEAD SHOWER FLOOR YOU MUST ATTACH THIS STATIC CLING USER WARNING LABEL IN THE SHOWER NEXT TO THE CONTROL UPON COMPLETION OF INSTALLATION ...

Страница 3: ...generators are designed to build NO PRESSURE during operation This is for your safety Note Failure to follow installation instructions specifically will cause the warranty to be void Figure 1 Note The generator must be mounted level with all connections on top PRESSURE RELIEF VALVE CONTROL CABLE INPUT FRONT OF GENERATOR ACCESS PANEL POWERFLUSH BALL VALVE IN CLOSED POSITION WATER INLET 17 12 AT PIP...

Страница 4: ...Tools Needed Pipe wrench Tubing cutter Wire cutters or wire strippers Adjustable wrench Screwdrivers phillips regular Solder Flux 1 1 16 masonry drill bit 2 1 2 hole saw for NoTouch Steamhead Drill motor Propane torch Other tools as required Note ThermaSol steam bath generators are for indoor use only They should never be located outside the home Note ThermaSol steam bath generators are NOT design...

Страница 5: ...LL HAZARD CHECK WITH YOUR CONTRACTOR OR FLOORING MANUFACTURER REGARDING THE SAFE USE OF YOUR FLOORING IN A STEAM APPLICATION SLIPPING AND FALLING INTO THE STEAMHEAD ITSELF OR INTO THE STREAM OF STEAM EMITTING FROM THE STEAMHEAD WILL CAUSE SERIOUS BURNS OR PHYSICAL INJURY WARNING STEAM IS HOT DO NOT TOUCH OR GO NEAR THE STEAMHEAD FROM THE TIME THE UNIT IS ON UP TO ONE HOUR AFTER IT HAS SHUT OFF SEV...

Страница 6: ...ove any silt or other materials that may be in the line 10 Make the final connection and turn on water All ThermaSol generators are equipped with an automatic water fill system The water will stop after unit is filled 11 The steam line can run up down or horizontal but cannot run down and then up If it does a steam trap will be produced at the low point blocking the flow of steam Do not plumb a tr...

Страница 7: ... all connections on top COUPLER ONETOUCH CONTROL STEAMHEAD TEE IMPORTANT LOCATE THE STEAMHEAD 12 OFF THE SHOWER FLOOR OR BATHTUB RIM AND 6 FROM ANY CORNER STEAMHEAD IS TO BE MOUNTED FAR AS POSSIBLE FROM TYPICAL BATHING POSITION SEATED OR STANDING AND AS FAR FROM CONTROL AS POSSIBLE WHILE MAINTAINING A 60 CONTROL HEIGHT PRESSURE RELIEF VALVE 50 FOOT CONTROL CABLE SHUT OFF VALVE WATER INLLET ELITE C...

Страница 8: ...LL HAZARD CHECK WITH YOUR CONTRACTOR OR FLOORING MANUFACTURER REGARDING THE SAFE USE OF YOUR FLOORING IN A STEAM APPLICATION SLIPPING AND FALLING INTO THE STEAMHEAD ITSELF OR INTO THE STREAM OF STEAM EMITTING FROM THE STEAMHEAD WILL CAUSE SERIOUS BURNS OR PHYSICAL INJURY WARNING STEAM IS HOT DO NOT TOUCH OR GO NEAR THE STEAMHEAD FROM THE TIME THE UNIT IS ON UP TO ONE HOUR AFTER IT HAS SHUT OFF SEV...

Страница 9: ...1 2 hole cutting tool Other tools as required 1 Drill a 2 1 2 diameter hole in the shower wall or wall above the bathtub rim for the steam outlet line see Figure 4 CAUTION The Steamhead is hot and should not be located near a seat or bench We recommend locating the Steamhead on the fixture wall Ensure that all Plumbing is Firmly Secured Figure 4 STEAMHEAD STEAMHEAD HOUSING 2 1 2 HOLE 1 2 PIPE SHOW...

Страница 10: ...the housing be sure that the aromatherapy fill channels are facing upwards see Figure 5 To ensure that no moisture gets behind the Steamhead and into the wall place a generous bead of waterproof silicone around the Steamhead use the machined grove located on the back of the Steamhead as a guide Be sure that within the housing there isn t any debris and the two O rings are in place on the Steamhead...

Страница 11: ...ALL HAZARD CHECK WITH YOUR CONTRACTOR OR FLOORING MANUFACTURER REGARDING THE SAFE USE OF YOUR FLOORING IN A STEAM APPLICATION SLIPPING AND FALLING INTO THE STEAMHEAD ITSELF OR INTO THE STREAM OF STEAM EMITTING FROM THE STEAMHEAD WILL CAUSE SERIOUS BURNS OR PHYSICAL INJURY WARNING STEAM IS HOT DO NOT TOUCH OR GO NEAR THE STEAMHEAD FROM THE TIME THE UNIT IS ON UP TO ONE HOUR AFTER IT HAS SHUT OFF SE...

Страница 12: ...uge Breaker Size Factory Sized Cu Ft MAX AMP draw 240 VAC K W SS Acrylic 1 10 20 Acrylic Insert 17 3 5 SS 84 1 10 30 84 28 6 0 SS 140 1 8 40 140 37 8 0 SS 240 1 8 50 240 46 10 SS 395 1 6 60 395 55 12 SS 600 1 4 80 500 69 15 Electrical Questions 800 776 0711 for Technical Support Warning Each generator should be wired to their own separate breaker 1 Turn off all electricity to the working area at t...

Страница 13: ...ALL HAZARD CHECK WITH YOUR CONTRACTOR OR FLOORING MANUFACTURER REGARDING THE SAFE USE OF YOUR FLOORING IN A STEAM APPLICATION SLIPPING AND FALLING INTO THE STEAMHEAD ITSELF OR INTO THE STREAM OF STEAM EMITTING FROM THE STEAMHEAD WILL CAUSE SERIOUS BURNS OR PHYSICAL INJURY WARNING STEAM IS HOT DO NOT TOUCH OR GO NEAR THE STEAMHEAD FROM THE TIME THE UNIT IS ON UP TO ONE HOUR AFTER IT HAS SHUT OFF SE...

Страница 14: ... 16 diameter hole Plug the modular connector of the control into one end of the coupler Plug the control cable s from the generator into the other end of the coupler Route the cable so that the coupler is located ABOVE the hole in the wall DO NOT pinch nail staple wedge etc the cable DO NOT wrap the cable around steam line or otherwise route it in such a manner that the hot steam line could melt t...

Страница 15: ... to harm the wall control with the tape Let dry for 24 hours before using steam bath 10 Refer to operation instructions for control functions Note Failure to follow installation instructions specifically will cause the warranty to be void COAT THE BACK COMPETELY WITH SUPPLIED WATERPROOF SILICONE TO COMPLETELY SEAL THE CONTROL TO THE WALL AND NOT ALLOW MOISTURE BEHIND IT 1 1 16 DRILL HOLE IN WALL F...

Страница 16: ...eam Generator 1 Power on the control and set the timer to 45 minutes Open the powerflush ball valve located on top of the generator refer to Figure 1 for 5 7 minutes then close Allow generator to finish the 45 minute session See following document for more detail about powerflushing ThermaSol recommends one powerflush cycle after every fifty uses Warning IT IS IMPORTANT THAT NO ONE BE INSIDE THE S...

Страница 17: ... set the timer to 45 minutes 2 Open the powerflush ball valve located on top of the generator for 5 7 minutes 3 After 5 7 minutes close the powerflush ball valve 4 Allow generator to finish the 45 minute session ThermaSol recommends one powerflush cycle after every fifty uses or at least twice a year Warning IT IS IMPORTANT THAT NO ONE BE INSIDE THE SHOWER ENCLOSURE DURING THE POWERFLUSH CLEANING ...

Страница 18: ...ALL HAZARD CHECK WITH YOUR CONTRACTOR OR FLOORING MANUFACTURER REGARDING THE SAFE USE OF YOUR FLOORING IN A STEAM APPLICATION SLIPPING AND FALLING INTO THE STEAMHEAD ITSELF OR INTO THE STREAM OF STEAM EMITTING FROM THE STEAMHEAD WILL CAUSE SERIOUS BURNS OR PHYSICAL INJURY WARNING STEAM IS HOT DO NOT TOUCH OR GO NEAR THE STEAMHEAD FROM THE TIME THE UNIT IS ON UP TO ONE HOUR AFTER IT HAS SHUT OFF SE...

Отзывы: