The DATA Extra HIU, Installation Instructions DE2, 12th August 2021
Introduction
The DATA Extra HIU enables us to take the functions of our flagship twin plate
HIU and increase the heating output to cater for
commercial or industrial applications. The basis of this HIU is our
hot water only HIU and then we add a heating plate heat
exchanger and Danfoss pressure independent control valve with a Novocon Actuator for the heating side of the HIU. Both the heating
and hot water controls are linked to our Node-iHIU system and can be accessed remotely for monitoring and adjustment.
The fully insulated HIU is enclosed within a white steel enclosure designed to keep the overall footprint of the HIU to an absolute
minimum. If required, the expansion vessel, safety relief valve, filling loop and pump are mounted external to the casing, allowing the
HIU to be fitted out of the way, with key components mounted in a more accessible location.
The heating installation must be equipped with a correctly sized expansion vessel and safety relief valve fitted between the HIU
and any isolation valve on the heating circuit. It is also advisable to fit a filling loop and pressure gauge to the heating system, in
a location convenient for the end user to access and top-up the central heating system. Refer to the chapter on "Installation
Requirements" for more information. Contact Thermal Integration for more information on parts availability and advice on
system safety.
Page 4
Содержание DATA Extra HIU
Страница 7: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 Dimensions Page 7...
Страница 15: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 HIU Schematic Page 15...
Страница 17: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 Wiring Schematic Page 17...
Страница 21: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 DHW Performance DHW Performance Table Page 21...
Страница 26: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 Secondary Flow Rate CH Pressure Drops Page 26...
Страница 29: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 Stage 3 Pipe Connections Page 29...
Страница 33: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 Page 33...
Страница 37: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 Page 37...
Страница 38: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 Page 38...
Страница 40: ...The DATA Extra HIU Installation Instructions DE2 12th August 2021 Troubleshooting for Technicians Page 40...