English 3
*For solid surface countertop installations, use maximum cutout dimensions and consult surface manufacturer for
specific cutting instructions.
Power Requirements
Power Supply is dual rated: 240 Volts or 208 Volts, 3 wire, 60 Hz, with the following
circuit breaker requirements:
•
Model CEM304: 30 Amp circuit breaker
•
Model CEM365: 40 Amp circuit breaker
•
Model CEM456: 50 Amp circuit breaker
•
All Models: 240 Volt, 3 Wire, 60 Hz / 208 Volt, 3 Wire, 60 Hz
Install a junction box (not supplied), below the counter top within 3 feet (91.4 cm) of
flexible conduit (supplied) located at the right rear corner of the cooktop rough-in
box. Plan the installation of the unit so that the location of the junction box is within 3
feet (91.4 cm) of the right rear of the cooktop bottom. It must be accessible from the
front of the cabinet.
Figure 3 - Junction Box Installation
Installation Procedure
WARNING:
To avoid electrical shock hazard, before installing the cooktop, switch
power off at the service panel and lock the panel to prevent the power
from being switched on accidentally.
Seal with Foam Tape
A foam tape is provided to seal the cooktop edges to the countertop. Turn cooktop
upside down and apply tape approximately 1/16” (1.6 mm) from the glass edges.
Use tape around the entire glass perimeter. Cut off excess tape where tape ends
butt.
Model
#
Minimum Inches / (mm)
Maximum Inches / (mm)
CEM304
B
C
19-7/8" / (505 mm)
28-3/4" / (731 mm)
20" / (508 mm)
28-7/8" / (734 mm)
CEM365
B
C
19-7/8" / (505 mm)
34-3/4" / (883 mm)
20" / (508 mm)
34-7/8" / (886 mm)
CEM456
B
C
19-7/8" / (505 mm)
43-3/4" / (1111 mm)
20" / (508 mm)
43-7/8" / (1114 mm)
“j” Box
Conduit
(approx 3 ft.(91.4 cm))
12”
(30.4 cm)
(approx)
Содержание CEM COOKTOP
Страница 1: ...CEM COOK TOP INSTALLATION INSTRUCTIONS...