background image

©2018 Thermaco, Inc. All rights reserved  •  Patented/Patents Pending  •  Specifications subject to change without notice

Thermaco, Inc. • 646 Greensboro St. • Asheboro, N. C. 27204-2548 • (336) 629-4651

MNL-TZ-1826  13

A THERMACO® Technology

Trapzilla

®

 Grease Interceptor

Installation and Operations Manual

TZ-1826 Models

AEF

MNL-TZ-1826  12

4.3.2 Construction of Riser for TSS-95-SSA installation in series with TZ-1826-SSA

For the installation of a TSS-95-SSA prior to the TZ-1826-SSA, a riser must be constructed to raise the 

smaller unit by 8” and provide full support for the weight of the interceptor and its contents. 

4.3.3 Installing Multiple TZ-1826-SSA in Series

When installing multiple Trapzilla units in series, the change in elevation from the inlet to the outlet of a unit 

requires that each preceding unit be installed 1.5” higher than the unit after it.  For above-ground units, 

pressure treated plywood may be placed fully beneath the support stand to create the height difference.

All installations inside of a building must have a vessel vent installed and be piped to atmosphere.

4.2 Instructions for Assembling and Attaching External Brace

4.3 Instructions for Installing Multiple Trapzilla Units Above-Ground

4.3.1 Installing TZ-1826-SSA with TSS-95-SSA in Series

When installing a TZ-1826-SSA Interceptor with a TSS-95-SSA Solids Interceptor in series, the change 

in elevation from the outlet of one of these smaller units to the inlet of the TZ-1826-SSA to the requires 

that the preceding unit be installed 8” higher than the unit after it.

1

1

2

2

3

3

4

4

A

A

B

B

C

C

D

D



THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL.  THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE OR PART WITHOUT

WRITTEN CONSENT FROM THERMACO, INC.  POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE.

POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO, INC. AND THE HOLDER OF

THIS DRAWING.  DO NOT DESTROY THIS DRAWING, IT IS THE SOLE PROPERTY OF THERMACO, INC. AND MUST BE RETURNED UPON REQUEST.

MATERIAL (UNLESS NOTED)

FINISH (UNLESS NOTED)

646 GREENSBORO STREET

PO BOX 2548, ASHEBORO, NC 27203

VOICE 336-629-4651 FAX 336-626-5739

Decimals

.XX +/- .03

.XXX +/- .015

Unless otherwise specified

Dimensions are in inches

Tolerances

Angular

+/- 1°

CHECKED

SIZE

REV. NO.

DWG NO.

PART NO.

C

SCALE

RELEASE DATE

SHEET     OF

ENGINEERING

DRAWN

DATE

THIRD ANGLE PROJECTION

8" ELEVATION DIFFERENCE

(MINIMUM) BETWEEN TSS

AND TZ TO ENSURE FLOW

AND TO COMPENSATE FOR

HEIGHT DIFFERENCES. A 

RISER MADE FROM TREATED

LUMBER OR CONCRETE MAY

BE USED.

LAMINATED

PLYWOOD

RISER

FRAMED FLOOR RISER

WITH PLYWOOD TOP

FOR CONTINUOUS

SUPPORT

36" SQUARE MINIMUM

Note: Drawing for reference only.  Equipment must be installed in compliance with all applicable laws, regulations 

and codes, including plumbing codes.  Installation should be performed by a qualified plumber. 

1

1

2

2

3

3

4

4

A

A

B

B

C

C

D

D



THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL.  THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE OR PART WITHOUT

WRITTEN CONSENT FROM THERMACO, INC.  POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE.

POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO, INC. AND THE HOLDER OF

THIS DRAWING.  DO NOT DESTROY THIS DRAWING, IT IS THE SOLE PROPERTY OF THERMACO, INC. AND MUST BE RETURNED UPON REQUEST.

MATERIAL (UNLESS NOTED)

FINISH (UNLESS NOTED)

646 GREENSBORO STREET

PO BOX 2548, ASHEBORO, NC 27203

VOICE 336-629-4651 FAX 336-626-5739

Decimals

.XX +/- .03

.XXX +/- .015

Unless otherwise specified

Dimensions are in inches

Tolerances

Angular

+/- 1°

CHECKED

SIZE

REV. NO.

DWG NO.

PART NO.

C

SCALE

RELEASE DATE

SHEET     OF

ENGINEERING

DRAWN

DATE

THIRD ANGLE PROJECTION

1.5" ELEVATION DIFFERENCE

(MINIMUM) BETWEEN FRONT

UNIT AND REAR UNIT TO

ENSURE FLOW AND TO

COMPENSATE FOR HEIGHT

DIFFERENCES

1

1

2

2

3

3

4

4

A

A

B

B

C

C

D

D



THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL.  THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE OR PART WITHOUT

WRITTEN CONSENT FROM THERMACO, INC.  POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE.

POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO, INC. AND THE HOLDER OF

THIS DRAWING.  DO NOT DESTROY THIS DRAWING, IT IS THE SOLE PROPERTY OF THERMACO, INC. AND MUST BE RETURNED UPON REQUEST.

MATERIAL (UNLESS NOTED)

FINISH (UNLESS NOTED)

646 GREENSBORO STREET

PO BOX 2548, ASHEBORO, NC 27203

VOICE 336-629-4651 FAX 336-626-5739

Decimals

.XX +/- .03

.XXX +/- .015

Unless otherwise specified

Dimensions are in inches

Tolerances

Angular

+/- 1°

CHECKED

SIZE

REV. NO.

DWG NO.

PART NO.

C

SCALE

RELEASE DATE

SHEET     OF

ENGINEERING

DRAWN

DATE

THIRD ANGLE PROJECTION

PLYWOOD STACK RISER

ASSEMBLE SHEETS OF PRESSURE

TREATED PLYWOOD (MINIMUM

36 INCHES [92CM] SQUARE) TO

THE DESIRED HEIGHT. SECURE

EACH LAYER TO THE ONE BELOW

WITH CORROSION RESISTANT

SCREWS.

FRAMED FLOOR RISER

CONSTRUCT A FLOOR SUPPORT FRAME

(MINIMUM 36 INCHES [92CM] SQUARE) FROM

PRESSURE TREATED LUMBER OF 2 IN [50MM]

NOMINAL THICKNESS AND OF THE DESIRED

HEIGHT.  SPACE FRAME MEMBERS NO MORE THAN

10 IN [25CM] APART.  COVER THIS STRUCTURE

WITH PRESSURE TREATED PLYWOOD.  SECURE ALL

JOINTS WITH CORROSION RESISTANT SCREWS.

 

 

 

1

2

3

1

1

2

2

3

3

4

4

A

A

B

B

C

C

D

D



THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL.  THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE OR PART WITHOUT

WRITTEN CONSENT FROM THERMACO, INC.  POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE.

POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO, INC. AND THE HOLDER OF

THIS DRAWING.  DO NOT DESTROY THIS DRAWING, IT IS THE SOLE PROPERTY OF THERMACO, INC. AND MUST BE RETURNED UPON REQUEST.

MATERIAL (UNLESS NOTED)

FINISH (UNLESS NOTED)

646 GREENSBORO STREET

PO BOX 2548, ASHEBORO, NC 27203

VOICE 336-629-4651 FAX 336-626-5739

Decimals

.XX +/- .03

.XXX +/- .015

Unless otherwise specified

Dimensions are in inches

Tolerances

Angular

+/- 1°

CHECKED

SIZE

REV. NO.

DWG NO.

PART NO.

C

SCALE

RELEASE DATE

SHEET     OF

ENGINEERING

DRAWN

DATE

THIRD ANGLE PROJECTION

RAIL

PLATE

UPPER SUPPORT RIB

CENTER SUPPORT RIB

LOWER SUPPORT RIB

1. PLACE ONE RAIL ON

EACH SIDE OF TZ-1826

WITH TABS ON TOP AND

BOTTOM OF CENTER

SUPPORT RIB.

2. PLACE ONE PLATE ON TOP

OF CENTER SUPPORT RIB AND

ONE ON THE BOTTOM ON EACH

END OF THE TZ-1826.  ALIGN

HOLES IN THE PLATES AND RAILS.

3. INSERT 2 BOLTS

INTO HOLES AT EACH

CORNER.  ADD NUTS

AND TIGHTEN TO

COMPLETE ASSEMBLY.

Содержание Trapzilla TZ-1826

Страница 1: ...HOLE OR PART WITHOUT WRITTEN CONSENT FROM THERMACO INC POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREE...

Страница 2: ...There are many factors influencing odor evolution and dissemination These include room ventilation kitchen menu ambient temperatures ware washing practices grease oil input daily input fluid volume sa...

Страница 3: ...andard STC 22 cover Each TZ 1826 would require two 2 FTCA 22 covers SSA 1826 Support Stand for TZ 1826 forAbove Ground Installations Must be fully supported not to be installed over grates Included wi...

Страница 4: ...diameter of the system s outlet connection must be present as close as possible to the Trapzilla outlet to prevent possible siphonage problems The Vent on the Outlet piping is to be installed in accor...

Страница 5: ...ut before and after all Trapzilla Installations Outlet Inlet Cleanout Cleanout Outlet Vent Connect to facility vent Note Drawing for reference only Equipment must be installed in compliance with all a...

Страница 6: ...ts Connect to facility vent Low Head Flow Control not pictured to be installed as close as possible to inlet of first grease interceptor Cleanout Note Drawing for reference only Equipment must be inst...

Страница 7: ...ESS NOTED 646 GREENSBORO STREET PO BOX 2548 ASHEBORO NC 27203 VOICE 336 629 4651 FAX 336 626 5739 Decimals XX 03 XXX 015 Unless otherwise specified Dimensions are in inches Tolerances Angular 1 CHECKE...

Страница 8: ...it may also be installed in the ground inside or outside of the facility For instances where the facility drainage piping requires an extension collar that is more than the 18 provided by the built in...

Страница 9: ...s purchased separately In some cases TZ 1826 may be installed in locations where built in extension collar will not reach grade In these cases the two piece ECA TZ 29 Extension Collar purchased separa...

Страница 10: ...dapter ring Two of these screws should be installed in each of the four 4 skirt areas of the adapter ring Check the extension collar height dimension frequently during this operation to ensure that th...

Страница 11: ...bolts and fully remove the 22 lid to pump out It is not necessary to remove adapter lid to pump out Trapzilla 2 Begin by taking the grease from the top of the main chamber until all grease is removed...

Страница 12: ...not arising out of defects in workmanship or materials Thermaco shall not be responsible for damage to Products resulting from ultraviolet light exposure vault flooding sewer line back up pumping or...

Отзывы: