
4 MONOLITH BASIN SYSTEM MANUAL
monolith c series
components list
3-User 90” basin*
Before assembly, please check that all listed components are present and advise The Splash Lab of any
missing parts.
Wall mounting hardware is
not included for fastening the brackets to the wall as
every
location
differs
. The Splash Lab recommend that you consult
the Structural Engineer or General
Contractor
for advice on the most appropriate
mounting
method for your project.
*The 90" 3-user TSL.MON.C.90 is pictured for all examples in this guide. For
the most accurate
bracket
spacing
guide, please refer to the
shop drawings
for your project
.
A
Trough
1
B
Angled m
ounting bracket
4
C
Drainage funnel
3
D
Drainage funnel gasket
3
E
Drainage funnel
screws
(M6 x 12 screw and washer)
12
F
Mounting bolts
1/4-20 UNC x 3/4"
8
G
Lock
nuts
1/4-20 UNC
8
H
Washers
8
90”
B
G
A
F
H
D
C
E