![The Corner Fridge Cold Room Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/the-corner-fridge/cold-room/cold-room_installation-and-operation-instructions-manual_1099663006.webp)
6
Step 7
Screw the LED lamp securely to the ceiling at a point about 25 cm in from
the door frame.
Remove the protective tape on the cable conduit/connector bar and press it
securely in place on the ceiling as far as the female connector on the unit.
Then press the cable into the conduit and insert the contact.
Step 8
Place the shelves at the bottom of the cabinet, with the 2 shortest on top (Fig. 8.).
Fit the uprights/brackets onto the back wall using the screws supplied.
Lift the top shelf into the desired position in the cabinet and
then attach the shelf brackets to the uprights just below
the shelf. Repeat the process for the remaining three shelves.
Press the shelves down into the groove to secure them.
Make sure that the second top shelf does not come into
conflict with the dust filter tray on the unit.
NOTE:
If the cold room is to be integrated, this should
be done before the shelves are placed in position.
See Step 9.
Step 9 - Integration
The depth of the cover panels and the worktop will determine the distance from the wall at which the cold room must be
positioned.
First fit the finishing panel securely onto the door in the correct position using the Velcro hooks and loops fasteners
supplied.
Drill eight 5 mm holes in the Cold Room door. Screw the finishing panel in place using the 5 mm long screws supplied.
Screwing is done from the inside outwards. Use the plastic discs and decorative cups supplied to conceal the screws.
For integration of the side walls, repeat the procedure omitting the hook and loop fasteners.
NOTE:
Screw in the integration screws
carefully, so that they do not pass through
the finishing panel.
Apply the sealing foam strip supplied between
the Cold Room and the wall on the top edge, but
avoiding sealing where the air channel from the
unit comes up (this must not be blocked). (Fig. 9)
Place a ventilation grille in the base plate under
the door. In the case of ceiling-height integration,
two ventilation grilles must be installed above the
Cold Room too as shown.
Fig. 7
Fig. 8
Fig. 9