2
!
Proper operation of lightning protection modules
(ESG and PSG) is guaranteed only when they are
used as part of TFortis SG-Switches.
!
The specified technical parameters are guaranteed
for the protection of TFortis PSW switches
manufactured starting 07.2017.
!
Grounding of the switch is obligatory.
!
It is recommended to check the integrity of
lightning protection device at the beginning and the
end of the storm season and immediately after the
storm.