![TFC Tower APUMP-HE Series Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/tfc/tower-apump-he-series/tower-apump-he-series_installation-and-operation-manual_1098951007.webp)
4.2. Position of Junction Box
06
4.3.
The junction box can be rotated in a step of 90°.
The procedures for changing the position of junction box are as follows:
1. Close the valves at the inlet and outlet and release the pressure;
2. Unscrew and remove the four socket head screws that fasten the pump body;
3. Rotate the motor to the required position and align the four screw holes;
4. Install the four socket head screws again and fasten them clockwise making
sure they are fully tightened;
Changing Position of Junction Box
APUMP-HE
5. Open the valves at the inlet and outlet.
Содержание Tower APUMP-HE Series
Страница 9: ...5 Electrical Connection 08 APUMP HE ...