NOTE
To keep users safe, always read and follow all safety warnings
provided with each of the instruments in your system.
Install the instrument
You can use the 2601B-PULSE on a bench or in a rack. See
the instructions that came with your rack-mount kit if you are
installing the 2601B-PULSE in a rack.
To prevent damaging heat build-up and ensure specified
performance, make sure there is adequate ventilation and
airflow around the instrument to ensure proper cooling. Do
not cover the ventilation holes on the top, sides, or bottom of
the instrument.
Position the instrument so that it is easy to reach any
disconnecting devices, such as the power cord and the
power switch.
Install the 2601B‑P‑INT
The 2601B-PULSE is shipped with the 2601B-P-INT
Rear-Panel Interlock and Cable Connector Box. The
2601B-P-INT provides connections for an optional hardware
safety interlock and simplifies test connections to the
2601B-PULSE.
To install the 2601B-P-INT:
1. Remove power connections from the 2601B-PULSE.
2.
On the rear panel of the 2601B-PULSE, remove the
screws to the left of the CHANNEL A: DC/PULSE
terminal strip and to the right of the CHANNEL A:
DC terminal strip. Screw locations are shown in the
following figure.
Remove screws before
installing 2601B-P-INT