Chapter 2
SNLU144 – may 2013
Quick Start Guide
This chapter provides minimal steps required to setup FPD23DAEVM in the two hardware configuration
depending upon the type of input signals. Switch and jumper position required for this operation have
been set at the factory.
1. Verify the factory settings for the adapter board as shown in
and
.
2. Connect either FPD-Link I input to J3 or parallel LVCMOS (RGB888) input to J2. Make sure that board
is configured for corresponding input type, refer to
and
3. Connect 12V power supply to either J6 or J1 as shown in . LED D1(green) indicates that board is
correctly powered up and 3.3V(200mA) supply is available at J5.
4. Connect an HDMI/DVI compatible display device to J4 using an HDMI cable. Desired results can be
observed on the display.
(2)
2.1
Board Setup with FPD-Link input
In this configuration, connect input to J3 and instructions below should be followed,
1. Make sure RN5, RN6, RN7 and RN8 are mounted.
2. To avoid stubs, RN1, RN2, RN3 and RN4 should not be mounted.
3. Verify pin HIGH and PDN to be shorted on JP2 while using FPD-Link I input.
Figure 2-1. FPD23DAEVM with FPD-Link input
(2)
MSEN/PO1 signal on TP4 should be high, once the display/receiver connected to J4 is detected properly.
4
Quick Start Guide
SNLU144 – may 2013
Copyright © 2013, Texas Instruments Incorporated