background image

Setup

www.ti.com

4

SLVUBE1A – February 2018 – Revised April 2018

Submit Documentation Feedback

Copyright © 2018, Texas Instruments Incorporated

ESD224 Evaluation Module User's Guide

Set the scope attenuation factor to 40X.

Set the oscilloscope to trigger on a positive edge for (+) ESD and a negative edge for (–) ESD
strikes. The magnitude should be set to 20 V.

Following IEC 61000-4-2, strike contact ESD to TP1.

Recommended settings for the time axis is 20 ns/div and for the voltage axis is 10 V division.

The voltage levels of the ESD applied to TP1 should not /– 8 kV when capturing clamping
waveforms.

If the clamping waveform for channel two is desired, follow the same procedure except connecting the
oscilloscope to J6 and striking TP3.

For best performance of this test, connect the IC, that the ESD224 is suppose to be protecting, to TP2 or
TP4 and then strike and see the waveform. This will show the clamping waveform when another device is
connected because the ESD224 limits the current seen by this IC during an ESD event.

3.2.1.3

Evaluation of Test Results

After ESD testing, perform normal operation testing to see if device has broken or not.

3.3

U3 and U4 - HDMI

At the top of the EVM there are two HDMI connectors, a male and a female. Two ESD224's (U3 and U4)
are placed between those connectors, on the TMDS data and TMDS clock lines, to provide ESD
protection for any devices connected downstream of the board. This board can be connected into a
system to pass HDMI 2.0 content, from an HDMI source to a display for example, in order to verify HDMI
2.0 compliance. However, due to the losses from the male and the female HDMI connectors, it is not
recommended to use this EVM board to run the standard HDMI 2.0 compliance tests. This EVM board is
intended for functional and ESD testing only. For running HDMI 2.0 compliance tests, it is recommended
to place ESD224s directly on the system board built specifically for such a purpose. Please note that this
EVM board was attached to the TPD158RGZEVM to run HDMI 2.0 compliance tests and the results
confirmed the HDMI 2.0 compliance with margin.

4

Board Layout

This section provides the ESD224EVM board layout. ESD224EVM is a 2-layer board of FR-408HR at
0.062” thickness. Layers 2, 3, and 4 are simple ground planes and not shown here.

Содержание ESD224

Страница 1: ...to 125 C The EVM contains four ESD224 s two for electrical characterization of the device and two sitting on the TMDS Data and Clock Lines with an HDMI female header on one side and a HDMI male header on the other The HDMI 2 0 pass through portion of the board can be snapped off to be used by itself This allows the EVM to be connected to an HDMI port via a HDMI cable and pass HDMI 2 0 signals thro...

Страница 2: ... 3 6 22 5 0 8 12 6 4 8 30 0 8 16 8 Figure 1 Ideal Contact Discharge Waveform of the Output Current of the ESD Simulator at 4 kV 3 Setup This section describes the intended use of the EVM A generalized outline of the procedure given in IEC 61000 4 2 is described here IEC 61000 4 2 should be referred to for a more specific testing outline Basic configurations for collecting S parameters Eye Diagrams...

Страница 3: ...Test Method and Set Up An example test setup is shown in Figure 2 Details of the testing table and ground planes can be found in the IEC 61000 4 2 test procedure Contact and air gap discharge are tested using the same simulator with the same discharge waveform While the simulator is in direct contact with the test point during contact it is not during air gap Figure 2 System Level ESD Test Setup 3...

Страница 4: ...ation of Test Results After ESD testing perform normal operation testing to see if device has broken or not 3 3 U3 and U4 HDMI At the top of the EVM there are two HDMI connectors a male and a female Two ESD224 s U3 and U4 are placed between those connectors on the TMDS data and TMDS clock lines to provide ESD protection for any devices connected downstream of the board This board can be connected ...

Страница 5: ...w ti com Board Layout 5 SLVUBE1A February 2018 Revised April 2018 Submit Documentation Feedback Copyright 2018 Texas Instruments Incorporated ESD224 Evaluation Module User s Guide Figure 3 3D Board Image ...

Страница 6: ...d Layout www ti com 6 SLVUBE1A February 2018 Revised April 2018 Submit Documentation Feedback Copyright 2018 Texas Instruments Incorporated ESD224 Evaluation Module User s Guide Figure 4 ESD224EVM Top Layer ...

Страница 7: ... com Board Layout 7 SLVUBE1A February 2018 Revised April 2018 Submit Documentation Feedback Copyright 2018 Texas Instruments Incorporated ESD224 Evaluation Module User s Guide Figure 5 ESD224EVM Bottom Layer ...

Страница 8: ... 4 5 J1 1 2 3 4 5 J2 1 2 3 4 5 J3 1 2 3 4 5 J4 1 2 3 4 5 J6 TP1 TP2 TP3 TP4 150 R1 150 R2 J7 Schematics and Bill of Materials www ti com 8 SLVUBE1A February 2018 Revised April 2018 Submit Documentation Feedback Copyright 2018 Texas Instruments Incorporated ESD224 Evaluation Module User s Guide 5 Schematics and Bill of Materials 5 1 Schematics Figure 6 ESD224EVM Schematic Table 4 Bill of Materials ...

Страница 9: ...y set forth above or credit User s account for such EVM TI s liability under this warranty shall be limited to EVMs that are returned during the warranty period to the address designated by TI and that are determined by TI not to conform to such warranty If TI elects to repair or replace such EVM TI shall have a reasonable time to repair such EVM or provide replacements Repaired EVMs shall be warr...

Страница 10: ...the user guide with the maximum permissible gain and required antenna impedance for each antenna type indicated Antenna types not included in this list having a gain greater than the maximum gain indicated for that type are strictly prohibited for use with this device Concernant les EVMs avec antennes détachables Conformément à la réglementation d Industrie Canada le présent émetteur radio peut fo...

Страница 11: ...ed loads Any loads applied outside of the specified output range may also result in unintended and or inaccurate operation and or possible permanent damage to the EVM and or interface electronics Please consult the EVM user guide prior to connecting any load to the EVM output If there is uncertainty as to the load specification please contact a TI field representative During normal operation even ...

Страница 12: ...COST OF REMOVAL OR REINSTALLATION ANCILLARY COSTS TO THE PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES RETESTING OUTSIDE COMPUTER TIME LABOR COSTS LOSS OF GOODWILL LOSS OF PROFITS LOSS OF SAVINGS LOSS OF USE LOSS OF DATA OR BUSINESS INTERRUPTION NO CLAIM SUIT OR ACTION SHALL BE BROUGHT AGAINST TI MORE THAN TWELVE 12 MONTHS AFTER THE EVENT THAT GAVE RISE TO THE CAUSE OF ACTION HAS OCCURRED 8 2 Specif...

Страница 13: ... TI Resource NO OTHER LICENSE EXPRESS OR IMPLIED BY ESTOPPEL OR OTHERWISE TO ANY OTHER TI INTELLECTUAL PROPERTY RIGHT AND NO LICENSE TO ANY TECHNOLOGY OR INTELLECTUAL PROPERTY RIGHT OF TI OR ANY THIRD PARTY IS GRANTED HEREIN including but not limited to any patent right copyright mask work right or other intellectual property right relating to any combination machine or process in which TI product...

Отзывы: