background image

Test Certification

www.ti.com

8

SLAU821 – October 2019

Submit Documentation Feedback

Copyright © 2019, Texas Instruments Incorporated

CAPTIVATE-EMC Getting Started Guide

5

Test Certification

TA Technology (Shanghai) Co., Ltd. in Shanghai, China validated the internal test findings of the
CAPTIVATE-EMC. Detailed test reports are available in

Enabling Noise Tolerant Capacitive Touch HMIs

With MSP CapTIvate™ Technology

.

6

REACH Compliance

In compliance with the Article 33 provision of the EU REACH regulation, we are notifying you that this
EVM includes component(s) containing at least one Substance of Very High Concern (SVHC) above
0.1%. These uses from Texas Instruments do not exceed 1 ton per year. The SVHCs are:

Component Manufacturer

Component type

Component

Part Number

SVHC

Substance

SVHC CAS

(When

Available)

Hirschmann Automation and Controls GmbH Test socket, PCB, 4 mm, red

973 582-101

Lead

7439-92-1

Hirschmann Automation and Controls GmbH Test socket, PCB, 4 mm, black

973 582-100

Lead

7439-92-1

Содержание CAPTIVATE-EMC

Страница 1: ...gram 4 3 2 Connectors 4 3 3 Power Supply 5 3 4 Debug Connector 5 4 Getting Started 5 4 1 Setting up the Hardware 6 4 2 Running the Out of Box Demo 6 4 3 Using CapTIvate Design Center 7 5 Test Certific...

Страница 2: ...ftware development tools are also available such as TI s Eclipse based Code Composer Studio IDE CCS and IAR Embedded Workbench IDE 1 1 Scope This getting started guide provides a brief overview of how...

Страница 3: ...following hardware and software Kit Contents 1 CAPTIVATE EMC evaluation board 1 quick start guide Software Examples The following software example is available to run on the MSP430FR2676 MCU on the C...

Страница 4: ...hardware see Figure 2 For a detailed description of the hardware see the CAPTIVATE EMC hardware description in the CapTIvate Technology Guide Figure 2 CAPTIVATE EMC Overview 3 1 Functional Block Diag...

Страница 5: ...TIVATE EMC when a DC power supply is enabled 3 4 Debug Connector The 20 pin debug connector J1 is for interfacing to the CAPTIVATE PGMR board This connector provides power Spy Bi Wire and UART connect...

Страница 6: ...power supplies at the same time because this can damage the CAPTIVATE PGMR board Figure 5 Hardware Setup 4 2 Running the Out of Box Demo By default after power up the CAPTIVATE EMC development kit run...

Страница 7: ...nection from the DC power supply Keep the DC power supply and connect the CAPTIVATE EMC to a host computer with CAPTIVATE PGMR and CAPTIVATE ISO Open CapTIvate Design Center on the host computer Figur...

Страница 8: ...ate Technology 6 REACH Compliance In compliance with the Article 33 provision of the EU REACH regulation we are notifying you that this EVM includes component s containing at least one Substance of Ve...

Страница 9: ...e resources are subject to change without notice TI grants you permission to use these resources only for development of an application that uses the TI products described in the resource Other reprod...

Отзывы: