
TVME201 User Manual Issue1.1.1
Page 22 of 26
6 Installation of IndustryPacks
Before installing an IndustryPack, be sure that the power supply for the TVME201 is turned off.
The component is an Electrostatic Sensitive Device (ESD). Use an anti-static mat connected to
a wristband when handling or installing the components.
Installing IndustryPacks on the TVME201 is done by simply snapping them into one of the four IP
slots. The connectors are keyed, so the IndustryPack can only be installed correctly.
After an IP has been installed it can be secured on the carrier board. This is normally necessary only
in high vibration or shock environments.
Screws and spacers are required to fix a single IP on the TVME201. They can be ordered from TEWS
TECHNOLOGIES GmbH (Part number: TIPxxx-HK).
All IPs mate with 50-pin SCSI connectors (AMP 787395-5) for their I/O. On the TVME201 all
connectors are accessible from the front panel. The front panel labeling indicates which connector is
associated with the according IP slot. Pin 1 for each cable is identified by the mark on the connector or
a square solder pad.
Figure 6-1 : Front Panel