DIN806BD
4-2
Tetra Pak
Hoyer
The HOYER Dino C pick-up machine and its
various components are delivered in special
packaging, normally in a wooden crate. The crate
should be unpacked as close to the location of
installation as possible; it may be transported with
a forklift.
When the crate has been positioned correctly,
proceed with unpacking as follows:
a. Extract the nails from the top of the crate and
remove the top. Repeat this operation for the
sides of the crate. Watch out for the wooden
spacers positioned between the sides of the
crate.
b. Remove the box of spare parts and other
components from the crate.
c. Extract the nails from the wooden blocks used
to secure the machine in transit and remove
the protective cellophane.
d. Check that the contents of the packages
correspond to the items indicated in the
shipping documents.
e. Check that the top and side panels of the crate
were correctly fixed and that no parts have
come loose in transit.
f. Visually inspect all electrical components,
looking for signs of damage.
g. If a part/component is missing, stop unpacking
the machine and notify Tetra Pak Hoyer
immediately.
h. If the machine has been damaged in transit,
notify the insurance company immediately and
do not proceed further with unpacking until
authorised to do so by the insurance company.
4.1 Unpacking and checking the contents
4.2 Positioning and installation
The installation procedure requires the following
steps:
a. Position the machine at the production
location (refer to the annexed layout), using a
forklift of adequate capacity to move it (Pos.
1, Fig.4.1 illustrates correct insertion of
forks). Make sure that there is sufficient space
to permit removal of protection and allow
access to components inside the machine.
b. Adjust the adjustable feet (Pos. 3, Fig. 4.2)
so that the machine is perfectly level both
lengthways and crossways.
c. Connect the pick-up machine to the tunnel,
fastening it using the tie rods provided (Pos.
3, Fig. 4.1).
d. Check that the roller surface is at the right
height.
RETURN TO PM
Содержание Hoyer Dino C
Страница 41: ...DIN806BI 9 11 Tetra Pak Hoyer Fig 9 6 Opening of load grippers 4 1 1 2 2 3 3 RETURN TO PM LAY OUT LIST...
Страница 47: ...DIN806BI 9 17 Tetra Pak Hoyer Fig 9 9 Translation 2 2 2 2 3 4 2 2 2 2 3 4 3 5 3 1 RETURN TO PM LAY OUT LIST...
Страница 49: ...DIN806BI 9 19 Tetra Pak Hoyer Fig 9 10 Translation 4 3 2 1 5 11 9 10 9 8 7 6 RETURN TO PM LAY OUT LIST...
Страница 51: ...DIN806BI 9 21 Tetra Pak Hoyer Fig 9 11 Stick roller 3 2 3 2 3 2 3 2 1 3 2 2 RETURN TO PM LAY OUT LIST...
Страница 55: ...DIN806BI 9 25 Tetra Pak Hoyer Fig 9 13 Stick pick up 4 3 2 7 6 7 6 5 5 1 RETURN TO PM LAY OUT LIST...
Страница 57: ...DIN806BI 9 27 Tetra Pak Hoyer Fig 9 14 Candy bar pick up 15 RETURN TO PM LAY OUT LIST...
Страница 61: ...DIN806BI 9 31 Tetra Pak Hoyer Fig 9 16 Cone pick up 2 3 4 4 5 6 7 8 8 9 9 1 RETURN TO PM LAY OUT LIST...
Страница 65: ...DIN806BI 9 35 Tetra Pak Hoyer Fig 9 18 Wafer cup pick up 2 3 4 4 5 6 7 7 8 8 1 RETURN TO PM LAY OUT LIST...
Страница 67: ...DIN806BI 9 37 Tetra Pak Hoyer Fig 9 19 Bricket pick up 6 8 6 7 6 8 3 2 5 4 9 1 RETURN TO PM LAY OUT LIST...
Страница 71: ...DIN806BI 9 41 Tetra Pak Hoyer Fig 9 21 Juice coating device 3 2 1 9 20 9 22 9 23 9 24 RETURN TO PM LAY OUT LIST...
Страница 79: ...DIN806BI 9 49 Tetra Pak Hoyer Fig 9 25 Chocolate tank 2 4 1 3 4 6 8 9 10 5 7 11 11 11 RETURN TO PM LAY OUT LIST...