X
Carefully open the packaging.
X
Check the shipment for completeness (refer to the shipping documents).
X
Separate the packaging material and dispose of it in an environmentally
responsible way.
Danger due to rotor imbalance!
X
Always replace the complete set of rotor blades.
Risk of injury in case of assembly at windy sites!
X
Choose an assembly site which is sheltered from the wind.
X
The assembly process requires calm weather conditions.
Fig. 6:
Assembling the wind turbine
X
5HSHOOHUEODWWPLWIODFKHUXEKDOWHQ
X
+ROGUHSHOOHUEODGHZLWKIODWVLGHRQKXE
X
:LWKD0[VFUHZQXWDQGIDVWHQRQH
X
6FUHZRQIXUWKHU0[VFUHZVDQGKDQGWLJKWHQ
.3
Unpacking the components
.4
Assembling the wind turbine
WARNING!
TESUP UK | DE | FR | ES | IT | TR | CA | US
TESU
P
TESUP
12
Содержание i-500
Страница 21: ...Fig 9 Declaration of conformity 1 Declaration of conformity TESUP UK DE FR ES IT TR CA US TESUP 20 ...
Страница 23: ...1 NotHV TESUP UK DE FR ES IT TR CA US TESUP 22 ...
Страница 24: ... 3HUIRUPDQFH KDUWV TESUP UK DE FR ES IT TR CA US TESUP 23 ...
Страница 25: ... TESUP UK DE FR ES IT TR CA US TESUP TESUP 24 ...