5 First steps
12
4.2.
Basic properties
Power supply
Power is supplied to the instrument via:
• Rechargeable battery, type: Li-Po rechargeable battery pack,
3.7 V/1500 mAh (can be replaced via Testo-Service)
• USB mains unit including cable (0554 1105), 5.0 V/1000 mAh
With an attached mains unit, power is supplied automatically via
the mains unit and the instrument's rechargeable battery is
charged. To avoid destroying the rechargeable battery, only charge
it at an ambient temperature of 0 to 45 °C/32 to 113 °F.
5
First steps
Switching on
Connect the humidity/temperature module (0636 9725)
before switching the instrument on (option).
1. Switch instrument on: press
[ ]
briefly.
- All segments of the display light up for around 1 sec.
- The warm-up phase then occurs for 30 s. (information in
display:
warm-up
).
During first commissioning, the configuration menu is
opened automatically, see Settings.
- The current readings are displayed. The instrument is
operational.
The CO sensor reading is displayed in the top line.
Switching off
2. Switch off the instrument: press and hold down
[ ]
.
Содержание 315-4
Страница 1: ...testo 315 4 CO ambient measuring instrument Instruction manual ...
Страница 2: ...2 ...
Страница 19: ......
Страница 20: ...0970 3154 en 01 V 01 00 ...