TESTING 1.0290 Скачать руководство пользователя страница 8

 
 
Electronic 
Blaine Air-Permeability Apparatus 
1.0290/1.0290E 
 

 

 

Note 

 

 

 

When the Electronic Blaine Air-Permeability Apparatus is delivered, it 
is NOT calibrated. 
If the customer requires, we can deliver the instrument with official cal-
ibration: as an option, for an additional price. 

Important

: do not place the Electronic Blaine Air-Permeability Appa-

ratus into operation before it has been properly calibrated. 

 
 

1.8  Instructions for electrical connection 

 

Danger 

 
 

The electrical connections must be made by properly qualified electri-
cians. 
Before making the power connections, make sure that your power sup-
ply  is  in  accordance  with  the  required  power  and  frequency  ratings 
given in these instructions and on the equipment rating plate. 
The  power  plug  must  have  a  safety  device  (an  overcurrent  trip)  that 
protects the system against overcurrent. This device must match the 
machine voltage, and must be in accordance with the valid regulations. 
The technical characteristics of this safety device must satisfy the reg-
ulations of the standards that apply in the country in which the machine 
is being installed.

 

Caution 

 
 

The  Manufacturer  cannot  be  held  liable  for  any  damage  that  takes 
place because the above instructions are not followed. 
 
 

 

Electrical tolerances: 

 
Actual voltage:  

 10% of the rated voltage 

Frequency:     

  1%  of  the  rated  frequency,  on  a  continual  basis; 

  2%  of  the  rated  fre-

quency, on a short-term basis 
The power supply may not be interrupted for longer than 3 ms, and may not be set to zero. 
Not more than 1 s may lapse between two power outages (cuts). 
The  power  outages  (cuts)  may  not  exceed 20% of  the  voltage peak for more  than one 
cycle. Not more than 1 s may elapse between two power cuts. 
 
The  manufacturer  cannot  be  held  liable  for  damages  to  persons  or  property  that  arise 
because the above instructions have not been observed. 
 
 

 

Содержание 1.0290

Страница 1: ...Distribution of Systems for the Testing of Construction Materials Motzener Str 26b DE 12277 Berlin Tel 49 30 7109645 0 Fax 49 30 7109645 98 1 Operating Manual Electronic Blaine Air Permeability Appar...

Страница 2: ...ns 5 1 6 Acceptance of the product and transport 6 1 6 1 Acceptance of the product 6 1 6 2 Transport 7 1 7 Scope of delivery 7 1 8 Instructions for electrical connection 8 2 Characteristics of the app...

Страница 3: ...nition of technically qualified staff has been provided in IEC 364 The User must by all means observe the requirements and limit values as well as all safety instructions given in this Operating Manua...

Страница 4: ...with the following actions being taken It may therefore NOT be used under such conditions or in connection with the following actions Do not disassemble this system Do not try to repair it or to modif...

Страница 5: ...criteria Persons who are at least eighteen 18 years of age and Persons who have been instructed in the operation of the Blaine Apparatus and In the operation of the Blaine Apparatus the person operati...

Страница 6: ...e descriptions given in this Operating Manual all applicable safety directives guidelines and regulations and all general rules for workplace environments The Operator must ensure that the personnel w...

Страница 7: ...o the point at which it is to be operated Its weight is approx 4 kg After you have unpacked the device make a visual inspection to determine whether it was damaged during transport In cases of doubt i...

Страница 8: ...ystem against overcurrent This device must match the machine voltage and must be in accordance with the valid regulations The technical characteristics of this safety device must satisfy the reg ulati...

Страница 9: ...provided by a separate power cable with a two pole and earthing pin plug The Manufacturer tests the function and liquid tightness of the apparatus before delivery 2 2 Technical data Power rating 110...

Страница 10: ...the injector hose into the U shaped tube Make sure that you can see the hose in the U shaped tube and also make sure that the manometer liquid actually flows into the tube Fill the liquid up to the lo...

Страница 11: ...mps of the oil level indicators will now show consecutively green amber and red The READY lamp will now go off The red lamp will now show which means that the digital counter is set to zero The pump s...

Страница 12: ...pparatus from the power supply Use a brush or vacuum cleaner to remove loose dust on the apparatus If neces sary the apparatus can then be cleaned with a moist cloth Use a normal household cleaning ag...

Страница 13: ...ctly pump valve is defective The pneumatic lines are loose or have leaks The U shaped tube is covered with condensation or dirt Get in touch with the Supplier Clean the U shaped tube The measured val...

Страница 14: ...ase see the diagram below 7 Shutting down the system for lengthy periods If the Blaine Apparatus is scheduled to remain out of operation for a lengthy period of time please follow these steps Disconne...

Страница 15: ...llowing company TESTING Bluhm Feuerherdt GmbH This Operating Manual is provided only for the using company and the staff of this com pany The information in this Operating Manual may not be Reproduced...

Отзывы: