Laboratory mortar mixer
1.0206.07
22
8.
Assembly/installation
Assemble/install the mixer as shown in the image below.
•
Place the device on a stable table.
•
Assemble the separately delivered control unit on the adjustable mixer arm (13 mm key
for hexagon bolts).
•
Connect the control cable to the bushing on the side of the mixer.
•
*Set up the metering pump next to the mixer
(see assembly options in the pump handbook)
•
*Connect the metering pump with the control unit
(for the cable connections see the Fig. under ‘Pump rear side’)
•
*Place the water tank near the pump
(preferably under the table)
•
*Fill the tank with distilled water or water of equivalent quality
•
*Insert the adapter into the tank
•
*Connect the cable of the level controller with the pump
•
*Connect the suction hose with the tank adapter to the pump outlet
•
*Connect the pressure hose to the pump outlet and nozzle
(Pay attention to the non-return valve’s flow direction indicated by the arrow)
•
*Connect the pump to the 230 V AC bushing on the left of the mixer
•
Connect the mixer ((3 x 400 V AC+N+PE, CEE-16A plug)
To the control unit
To the level controller
rear side
Содержание 1.0206.07
Страница 43: ...Laboratory mortar mixer 1 0206 07 43...
Страница 44: ...Laboratory mortar mixer 1 0206 07 44...
Страница 45: ...Laboratory mortar mixer 1 0206 07 45...
Страница 46: ...Laboratory mortar mixer 1 0206 07 46...
Страница 47: ...Laboratory mortar mixer 1 0206 07 47...
Страница 48: ...Laboratory mortar mixer 1 0206 07 48...