Chapter 7 – Maintenance
TestEquity 123HS Temperature/Humidity Chamber
Page 7-1
Chapter 7 – Maintenance
!
WARNING:
Maintenance must be performed by properly trained personnel only.
Preventive Maintenance Intervals
Daily or As Needed
•
Clean chamber interior and exterior.
•
Listen for abnormal noise or vibration.
•
Inspect the demineralizer cartridge (if provided).
Every 3 Months
•
Inspect the door seal.
•
Inspect the refrigeration machinery compartment.
•
Verify the chamber performance.
•
Drain the water recirculation system reservoir.
Every 6 Months
•
Inspect the electrical compartment.
•
Clean the condenser.
•
Drain the humidity system.
Every 12 Months
•
Verify the calibration.
Содержание 123HS
Страница 2: ......
Страница 20: ......
Страница 24: ......
Страница 28: ......
Страница 30: ......
Страница 48: ......
Страница 50: ......
Страница 51: ...Chapter 9 Drawings TestEquity 123HS Temperature Humidity Chamber Page 9 1 Chapter 9 Drawings...
Страница 52: ......
Страница 53: ...Electrical Subpanel Component Location Purge Subpanel optional Main Subpanel...