TI1000 GPU-24 UAV
4
Figure 2.1.1 – TI1000 GPU-24 UAV
2.2 – Indication of Terms: Shall, Should and May
Within this technical manual the word “shall” is used to indicate a mandatory requirement for proper operation
and warranty purposes. The word “should” is used to indicate a non-mandatory but preferred method of
accomplishment. The word “may” is used to indicate an acceptable method of accomplishment.
Section 2 – Product Overview
2.1 – Introduction
Thank you and congratulations on the purchase of your new TI1000 GPU-24 UAV Ground Power Unit.
The TI1000 GPU-24 UAV provides DC electrical ground power for aircraft flight line, maintenance, and
ground support operations. The unit is designed to provide 24 volt DC output for aircraft engine starting
and 24 or 28.5 volts DC output for ground maintenance, avionics/electrical troubleshooting and testing.
The observance of procedures, limitations and performance criteria ensures peak operating efficiency and
maximizes operational capabilities and life of the TI1000 GPU-24 UAV.
This manual contains the complete operating instructions and procedures for the TI1000 GPU-24 UAV
needed to safely and efficiently operate this GPU.