10
2.4
Connecting the UPS Power Cables
WARNING!!!
A separate power line should be used to supply the UPS AC input. Never use the
same line to supply another electrical device. Do not use any additional cable to
increase the length of the UPS’s input cable. It is advised to use an MCCB suitable
for the input current on the UPS’s input line.
The connection of the electrical panel should be supplied by a grounded outlet.
Otherwise,
the UPS and the load connected to the output will be left ungrounded. The
grounding system must be checked, and must be strengthen if required. Potential
difference between ground and neutral must be less than 3V AC.
Descriptions of the UPS input output cable connection terminals are shown in figure 2.2
Recommended input line cable and fuse ratings are given in the table below.
NOTES:
The neutral conductor should be sized for 1,5 times the output/bypass phase current. These
recommendations are for guideline purposes only and are superceded by local regulations
and codes of practice.
2.5 Safety Earth
The safety earth cable must be connected to the earth BUS BAR and bonded to each cabinet in
the system and also the earthing and neutral bonding arrangements must be in accordance with
the local laws.
ATTENTION!!!
Failure to follow adequate earthing procedures can result in electric shock hazard to
personnel, or the risk of fire.
2.6 Cable connection procedure
WARNING!!! All connections of the UPS must be done by qualified service personnel
After positioning the UPS, the cables must be connected as described below:
1. Verify all switches and fuses in front of the UPS are at
“0”
position. (OFF)
2. Connect the 3 phase AC input coming from the mains distribution panel to the AC input terminals as
shown on the label. (Figure 2.2)
ATTENTION!!!: ENSURE CORRECT PHASE SEQUENCE.
If there is a phase sequence error, UPS doesn’t transfer the load to INVERTER output. If
you can’t see SYNC:OK in the INFORMATION MENU on LCD, then change the input phase sequence.
3. Connect the output of the UPS to the load distribution panel.
4. Connect the battery groups. Refer to battery installation section.
UPS
power
(kVA)
Recommended cable size (mm
2
)
Line
input
Bypass input /
UPS output
External
Battery
Input / output
Cable
connections
U-V-W-N
Battery
connections
+ & -
INPUT
Fuses
Output/
Bypass
Fuses
Battery
Fuses
100
50
35
35
M8 bolt
M8 bolt
160A
160A
200A
120
50
50
50
M8 bolt
M8 bolt
200A
160A
250A
160
70
70
70
M8 bolt
M8 bolt
250A
250A
400A
Содержание DS300T Series
Страница 1: ...DS300T SERIES DSP Controlled UPS 100 120 160 kVA 3 Phase In 3 Phase Out USER MANUAL...
Страница 2: ......
Страница 16: ...13 26x12V Batteries 26x12V Batteries 0 312V 312V 0 K1 K2 K3 K2 Figure 2 3 External Battery Connections 52x12V...
Страница 64: ......
Страница 65: ...AGKK13831 10 2021...