background image

56-21XX and 56-22XX Series

DOPSM2097X012

7

Section 3: Introduction

October 2016

equipment supplier for evaluation and prompt service . Equipment is restored to the original 

factory performance specifications, if repairable. There are flat fee repair charges for each 

standard model . The original equipment warranty applies after a complete overhaul .

Proper Component Selection

1 .  Consider the total system design when selecting a component for use in a system .
2 .  The user is responsible for assuring all safety and warning requirements of the application 

are met through his/her own analysis and testing .

3 . 

TESCOM may suggest material for use with specific media upon request. Suggestions 

are based on technical compatibility resources through associations and manufacturers . 

TESCOM does NOT guarantee materials to be compatible with specific media -- THIS IS 
THE RESPONSIBILITY OF THE USER!

4 . 

Due to the varying composition, viscosity, corrosiveness and density of chemical fluids, 
the fluid media and full system must be considered by the user when selecting a product. 
This is required to ensure regulator performance, user safety, flow capability and system 

level performance .

5 .  Component function, adequate ratings, proper installation, operation and maintenance 

are the responsibilities of the system user .

Do not modify equipment or add attachments not approved by the manufacturer. Failure to 
do so can result in death, serious injury and/or property damage.

ASSEMBLY/INSTALLATION DRAWINGS AND BILLS OF MATERIAL drawings and parts lists for your 
product may be obtained by contacting TESCOM. TESCOM will provide these by email, fax or 
mail. Your local TESCOM representative can provide additional assistance. Be sure to have your 
complete model number ready.

Section 3: Introduction

TESCOM 56-21XX and 56-22XX Series Chemical injection flow control devices are 
specifically designed for offshore chemical injection applications. The 56-21XX and  
56-22XX Series utilize metering valves which allow for precise control of large flow ranges  
at pressures up to 15,000 psig / 1034 bar.

Содержание 56-2100

Страница 1: ...nd Service Manual DOPSM2097X012 October 2016 This manual is available in multiple languages online at www tescom com Do not attempt to select install use or maintain this product until you have read a...

Страница 2: ......

Страница 3: ...fety Installation and Operations Precautions 4 2 1 Regulators and Valves 4 2 2 Installation 6 2 3 Repair Service 6 Section 3 Introduction 7 Section 4 Specifications 8 Section 5 Drawings 8 5 1 Installa...

Страница 4: ...rmation reaches the operator and stays with the product after installation Do not permit untrained personnel to install use or maintain this regulator valve or accessory Improper selection improper in...

Страница 5: ...ressure to the system gradually avoiding a sudden surge of fluid or pressure shock to the equipment in the system 10 Regulators are not shut off devices Install a pressure relief device downstream of...

Страница 6: ...ded for use with all fluids 25 Do not bleed system by loosening fittings unless specified by Instruction Manual 26 Prevent icing of the equipment by removing excess moisture from the gas 27 Always use...

Страница 7: ...siveness and density of chemical fluids the fluid media and full system must be considered by the user when selecting a product This is required to ensure regulator performance user safety flow capabi...

Страница 8: ...mum Inlet Pressure 56 22XX Series 10 000 psig 690 bar MaximumOutletPressure56 21XXSeries 14 800 psig 1034 bar MaximumOutletPressure56 22XXSeries 4000 psig 276 bar Operating Temperature All 0 to 165 F...

Страница 9: ...ctober 2016 5 2 Installation Diagram for 56 22XX Series Letter call outs are referenced in the Installation and Start Up Procedures section of this manual OUTLET BLOCK VALVE INLET BLOCK VALVE 56 22XX...

Страница 10: ...ury equipment damage or leakage due to escaping accumulated fluid or bursting of pressure containing parts may result if this regulator is Over pressured Used with incompatible process fluid Installed...

Страница 11: ...ow through the system 10 Verify the regulator valve assembly s outlet pressure G to determine if there is any leakage If there is any leakage remove the 56 2XXX Series assembly for inspection and repa...

Страница 12: ...one 2 Dubai UAE T 971 4 811 8443 F 971 4 886 5465 mea tescom emerson com www tescom com DOPSM2097X012 TescomCorporation 2015 2016 All RightsReserved Tescom is a business unit of Emerson Process Manage...

Отзывы: