Installation and Operating Guide
Cleanroom Pass-Through Chambers
©
Copyright 2020 Terra Universal Inc. All rights reserved. • Revised Jul. 2020 • Document No. 1800-07
Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020
5
2.
Make a wall cut-out of the size specified in the table below.
Mounting Bracket Style
Wall Cut-Out Dimensions
Standard
Add 1/2" to the width and 1/2" to the height of the outside of the chamber
CleanMount®
Add 3” to the width and 1” to the height of the outside of the chamber
3.
Add framing to the inside of the wall cut-out using a rigid support material, such as wood or metal.
4.
Finish the wall cut-out with an appropriate substrate and finishing material. As a general rule, the wall cut-out should have
the same grade of finishing as the wall it is installed in (e.g. cleanroom-grade materials).
Figure 2:
from left) Pass-through with Standard Mounting bracket and Pass-through with CleanMount® Mounting Bracket