Terra Universal BioSafe+ Smart Pass-Through Скачать руководство пользователя страница 6

Installation and Operating Guide  

 

Smart Pass-Through Chambers

 

© 

Copyright 2017 Terra Universal Inc. All rights reserved. • Revised July 2020 • Document No. 1788-27  

Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020 

 

 

 

 

5.

 

To allow the pass-through to be removed for maintenance without requiring shut down of the cleanroom environment, be sure 

to finish the surfaces of the wall cutout with an appropriate non-shedding material, taking care not to obstruct the power supply 

connection. 

 

Installation Video: 

To view a video demonstrating a similar installation, please visit the following link:

 

https://youtu.be/1tnedlfBi9w

 

 

6.

 

Standing on the “clean” side of the wall, slide the pass-through completely into the wall until the welded mounting bracket is 

flush with the “clean”-side wall surface. The “clean”-side mounting bracket should fit tightly against the wall without the need for 

fasteners. 

 

7.

 

Install any support brackets and check the alignment of the pass-through chamber by following the procedures outlined in 

Section 2.2 Door Alignment

 

8.

 

The “dirty”-side mounting bracket is shipped preassembled. Pop off the bracket covers and slide the bracket onto the body of 

the pass-through (See 

Figure 4

). If necessary, detach one section of the mounting bracket by removing the two screws at each 

corner, creating a “C” shape. Slide the “C”-shaped bracket onto the chamber and then reattach the missing section, tightening 

all corner screws once the bracket is in place. 

 

 

9.

 

Confirm chamber positioning with a level, and insert the provided lag bolts into the pre-drilled holes in the mounting bracket. 

Thread the lag bolt into the guide that extends from the “clean”-side mounting bracket (See 

Figure 7

). The size of the pass-

through will determine the number of bolts required. Use a socket wrench to tighten the lag bolts into the pre-welded nuts until 

the mounting bracket is flush against the wall. 

 

 

 

 

 

 

Figure  5: 

Push the Smart Pass-through into the cut-out from the 

“clean”-side until it is flush with the wall 

 

Figure 6: 

Slide the “dirty”-side mounting bracket onto the body of the 

Smart Pass-through

 

 

Be careful not to over-tighten the “dirty”-side mounting bracket lag bolts. The bracket should be 

secured against the wall but should not bend inward (forming gaps). 

CAUTION 

Содержание BioSafe+ Smart Pass-Through

Страница 1: ...e Document No 1788 27 Smart Pass Through Chambers Copyright 2017 Terra Universal Inc All rights reserved Revised July 2020 Terra Universal Inc TerraUniversal com 800 S Raymond Ave Fullerton CA 92831 TEL 714 578 6000 FAX 714 578 6020 ...

Страница 2: ...00 FAX 714 578 6020 2 Table of Contents 1 0 Description 3 2 0 Installation 5 2 1 Wall Cut Out 5 2 2 Electrical 7 2 3 Door Alignment 8 2 4 Floor Mounted Pass throughs 9 2 5 Protruding Exhaust Flange or Filter Housing 10 3 0 Smart Pass through Accessory Modules 11 3 1 UV C Disinfection 11 3 2 Recirculating Air Showers 12 3 3 Load Presence Sensors 13 3 4 Refrigeration Module 14 4 0 Warranty 15 5 0 Ap...

Страница 3: ...ng instructions in this manual apply to both the standard Smart Pass Through and the BioSafe Smart Pass Through which features a non outgassing potted polyurethane door seal The standard model uses an e shaped heat formed gasket to seal the doors The Smart Pass Through series includes an electronic interlock which allows only one open door at a time thus minimizing the amount of dirty air that can...

Страница 4: ...ly useful if the pass through does not include windows Each alarm bell is synchronized with one of the doors on the pass through Once the Smart Pass Through has been installed and connected to a power supply each bell should be tested to determine the corresponding door If the alarm bells have not been labeled use the following procedure to determine alarm bell placement 1 Starting on the clean si...

Страница 5: ...ut out for this type of pass through installers now have the option of finishing and sealing the cut out with a cleanroom grade surface That way if the pass through must be removed at a later date the CleanMount System will disassemble quickly and cleanly while the cleanroom can remain in operation 2 Make a wall cut out of the size specified in the table below Mounting Bracket Style Wall Cut Out D...

Страница 6: ...s outlined in Section 2 2 Door Alignment 8 The dirty side mounting bracket is shipped preassembled Pop off the bracket covers and slide the bracket onto the body of the pass through See Figure 4 If necessary detach one section of the mounting bracket by removing the two screws at each corner creating a C shape Slide the C shaped bracket onto the chamber and then reattach the missing section tighte...

Страница 7: ...all surface caulking may be used to fill any seams or gaps after the installation is complete 2 2 Electrical Electrical wiring must be done by qualified person s in accordance with all applicable codes and standards including fire rated construction When cutting or drilling holes for electrical take caution not to damage electrical wiring or other hidden utilities WARNING 1 Once the pass through i...

Страница 8: ...g the mounting brackets to the wall 2 Large chambers may include support legs with leveling feet The feet adjacent to the cleanroom wall should be adjusted to support the chamber once the clean side door has been properly aligned 3 Repeat this procedure for the opposite i e dirty door Raise or lower the chamber corners until the door latch engages the center of the catch Then adjust the support fr...

Страница 9: ...components and the floor 1 Prepare the wall cut out outlined in Section 2 1 2 Align the floor ramps with the bottom of the pass through so that the two notches on the rear of the ramp hook onto the studs below the pass through doors Push the ramp in until it is flush with the surface of the pass through and then set it down The pass through door may need to be opened to ensure the ramp is fitted p...

Страница 10: ...lled these features will need to be detached from the pass through prior to installation to allow the pass through to fit through the wall cut out Figure 11 Exhaust Flange Figure 12 ULPA Filter Housing 1 To remove the exhaust flange unscrew the 8 domed cap nuts around the base of the flange and remove the flange See Figure 11 2 To remove the ULPA filter housing unscrew the 4 domed cap nuts on eith...

Страница 11: ...ugh some details may differ from your particular configuration Contact Terra Universal with any questions not answered by the information presented below 3 1 UV C Disinfection Avoid direct exposure to UV C light Never attempt to open the pass through doors when the UV disinfection cycle is in progress WARNING The UV C Sanitizing Module performs an exposure cycle that neutralizes bacteria viruses a...

Страница 12: ...ncrease the pressure within the chamber However increasing the speed too much can cause turbulence within the chamber and generate excessive heat from the motor A Minihelic gauge displays the pressure differential between the chamber and the external environment in inches of water column A typical pressure differential will read as a fraction of an inch of water column e g 0 5 WC depending on the ...

Страница 13: ... detect objects placed within the pass through using a pair of infrared beams Whenever interference is detected between the IR transmitter and receivers the Smart Pass through Controller sends a signal to the Load Presence indicator lights on both sides of the pass through alerting personnel of materials ready for transfer The indicator lights will blink until the object causing the interference h...

Страница 14: ...c operation prior to shipment To prevent overheating of the compressor and evaporator coils the refrigeration module s air intake and exhaust vents must be clear of obstruction after installation CAUTION To enter a new set point 1 Press MENU once to open Setpoint 1 Press MENU twice for Setpoint 2 2 Display flashes the first digit of Setpoint 1 3 Press MAX to set the digit 0 9 4 Press MIN to activa...

Страница 15: ...separately For Terra s Policy and Procedures for Returning Goods see Terra s Internet site www TerraUniversal com Generally customers can improve the chance of collecting on a freight claim by following these procedures 1 formally requesting that the carrier inspect the shipment immediately upon suspecting damage or shortage to verify condition 2 notifying the carrier upon discovery of concealed d...

Страница 16: ...rmed and Accepted Performed by Date All mounting brackets are secured tightly against the wall Support brackets if provided have been installed below the pass through No gaps larger than 1 16 exist between the pass through and the wall floor surface Pass through doors open smoothly and close completely with the latch centered in the corresponding catch The seal gasket on the inside of each door is...

Отзывы: