581-706 5” OD Arch Post Swing 8’ 6 Seat

 

Single Axis Swings: 
 

The Use/Fall Zone should extend to the front & rear, a minimum distance of 
twice the height of the Top Rail above the resilient surfacing material.  The 
Use/Fall Zone to the sides should follow the general recommendations of six 
feet minimum.  This six-foot zone may overlap that of an adjacent swing 
structure. 

 
Rotating Swings: 
 

The Use/Fall Zone should extend in all directions the length of the swing 
plus six feet.  The six-foot minimum fall zone from the supporting structure 
also applies, and may overlap the six-foot zone of an adjacent swing 
structure. 
 

GENERAL MAINTENANCE INSTRUCTIONS: 

 

 
Check MONTHLY for loose bolts, damaged or broken parts.  Tighten and/or 
replace immediately.  On swings and any equipment that uses S-hooks and/or 
Swing Hangers check the bearing surfaces for wear.  Replace any parts that 
show a reduction of 25% from the original size. 
 

ASSEMBLY AND INSTALLATION: 

 

NOTE: 

All threaded ends of bolts protruding beyond nuts must be cut off 
and/or peened to eliminate sharp edges.  No more than two threads 
should extend beyond face of nut.  All tubing must be hammered down to 
conform to the curved underlying surface to eliminate catch points.  DO 
NOT tighten nuts more than hand-tight until entire assembly is 
completed. 
 

STEP #1: 

Assemble swing frame on side, on ground.  If more than one section, 
assemble section by section.  Layout parts so that when frame is 
erected, legs will be in approximately correct position. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Содержание 581-706

Страница 1: ...they can possibly create dangerous situations leading to unnecessary accidents Resilient Surfacing should be used under all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy by calling 1 301 504 7908 PACKING LIST HARDWARE BAG 1 CTN Hardware Bag 12 585 521 3 ...

Страница 2: ...es up to 2 3 8 diameter Varying soil climatic conditions may require deeper and heavier footings in some areas Check local building codes Detail Detail Permanent Installation Suggested Bracing Method IF RESILIENT SURFACING IS TO BE LESS THAN 12 THEN ADDITIONAL PIPE SHOULD BE PUT IN CONCRETE TO MAINTAIN PROPER FINISH GRADE FOR EQUIPMENT USE AREA AND FOOTING LAYOUT ...

Страница 3: ...UCTIONS Check MONTHLY for loose bolts damaged or broken parts Tighten and or replace immediately On swings and any equipment that uses S hooks and or Swing Hangers check the bearing surfaces for wear Replace any parts that show a reduction of 25 from the original size ASSEMBLY AND INSTALLATION NOTE All threaded ends of bolts protruding beyond nuts must be cut off and or peened to eliminate sharp e...

Страница 4: ...der intended level of resilient surfacing and top rail is at desired height STEP 6 Plumb and level entire unit Tighten set screws by using short length of pipe on end of socket key to add leverage Pour concrete Crown surface Wait 48 hours before removing braces and using equipment STEP 7 Attach assembled seats to swing hangers by reattaching the pendulums to the swing hangers Do not over tighten b...

Отзывы: