581-504 4 ½” OD Single Post 4 Seat Swing

 

STEP #2: 

Remove swing hanger pendulums from the swing hanger assemblies.  Using S-
hooks, attach seats to chain and chain to swing hanger eyehook.  Close the 
S-hooks to within .034” (1/32”) using S-hook pliers or pounding with a 
hammer. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

STEP #3: 

Assemble top portion of Swing Hangers on Top Rail following spacing on Page 
#1. 
 

STEP #4: 

Footing holes may be marked out and dug from footing layout, however, it is 
easier to position swing in proper location, mark holes, move swing aside, 
and dig holes.  Dig holes 18” in diameter and 36” deep for the large pipe 
posts. 

 

STEP #5: 

Stand swing upright onto legs and brace in footing holes so that 18”of pipe 
will be under intended level of resilient surfacing and top rail is at 
desired height. 
 

STEP #6: 

Plumb and level entire unit.  Use short length of pipe on end of socket key 
to add leverage when tightening socket set screws.  Pour concrete.  Dome top 
of cement for proper drainage.  Wait 48 hours before removing braces, 
applying resilient surfacing and using equipment. 
 

STEP #7: 

Attach assembled seats to swing hangers by reattaching the bearing hooks to 
the swing hangers.  SEE STEP #2.  OD NOT overtighten bolt on pendulum.  
Hangers must move freely. 
 

STEP #8: 

Attach warning label and Manufacturer’s Identification label to a clean 
surface.  The labels should be attached in a location where they are clearly 
visible and legible and away from normal hand and foot placement areas.  The 
labels must be replaced if they become illegible, destroyed or removed.  
Contact your SportsPlay distributor for replacements. 

 
 

Maintenance:

  Periodically, tighten all loose parts and check for wear 

and/or damage.  If wear/damage is found, discontinue use of unit until 
repairs are completed. 

 
 

 
 

Содержание 581-504

Страница 1: ... of users Resilient surfacing should be used under all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy by calling 1 301 504 0708 PACKING LIST HARDWARE BAG 1 CTN Hardware Bag 4 196 802 x Socket Set Screw 2 PIPE 583 510 4 OD x 11 4 End Post 8 317 140 4 0 Cha...

Страница 2: ...sizes up to 5 diameter Varying soil climatic conditions may require deeper heavier footings in some areas Check local building codes Diagram Diagram Permanent Installation Suggested Bracing Method If resilient surfacing is to be less than 12 then additional pipe should be put in concrete to maintain proper finish grade for equipment USE AREA FOOTING LAYOUT ...

Страница 3: ...of the swing plus six feet The six foot minimum fall zone from the supporting structure also applies and may overlap the six foot zone of an adjacent swing structure GENERAL MAINTENANCE INSTRUCTIONS Check MONTHLY for loose bolts damaged or broken parts Tighten and or replace immediately On swings and any equipment that uses S Hooks and or Swing Hangers check the bearing surfaces for wear Replace a...

Страница 4: ...P 6 Plumb and level entire unit Use short length of pipe on end of socket key to add leverage when tightening socket set screws Pour concrete Dome top of cement for proper drainage Wait 48 hours before removing braces applying resilient surfacing and using equipment STEP 7 Attach assembled seats to swing hangers by reattaching the bearing hooks to the swing hangers SEE STEP 2 OD NOT overtighten bo...

Отзывы: