background image

If no vacuum cleaner is present, use the hand tools
as shown below.

Release the screw-balls that hold the plate below.

Clean the area inside with the ash cleaner or using
manual tools. When screwing back the holders,
screw completely, so that no air can pass inside.

Ukoliko ne posedujetevIf no vacuum cleaner is
present, use the hand tools as shown below.

18

Содержание TOBY B 12

Страница 1: ...act size wood pellet boiler TOBY B 12 17 21 DIRECTIONS for use and maintenance Prhovačka bb 22310 Šimanovci Srbija Tel Fax 381 22 480404 381 63 259422 podrska termomont rs www termomont rs December 13 2016 ...

Страница 2: ... 8 5 2 Connection to the chimney 9 5 3 Filling the system with water 10 5 4 Connecting the boiler with a closed central heating system 10 5 4 1 Installation method 1 11 5 4 2 Installation method 2 12 5 5 Use of temperature relief valve with obligatory filling 13 5 6 Fitting the boiler to an open central heating system 13 6 Return line protection against condensation 15 6 1 Boiler cleaning and main...

Страница 3: ...1 Basic Boiler data Type Width B mm Height H mm Length L mm B 12 565 1435 1465 725 B 17 615 1435 1465 775 B 20 635 1495 1525 900 2 ...

Страница 4: ...s less than the standard three pass TOBY 20 model 12 KW models can also come in so called SET versions SET means that circulation pump expansion vessel safety valve are all included and pre mounted into the boiler With purchase of additional boiler router regulation of this boiler can be connected with inter net boiler can be turned on off directly from mobile phone through application android and...

Страница 5: ...sor 4 Burner pot 5 Pellet doser tube 6 Opening for cleaning 7 Opening threads 8 Boiler housing lower carrier 9 Boiler housing upper carrier 10 Boiler small door with display 11 Boiler Tubulators Opening 12 Boiler housing mask 13 Lateral sides of the housing 4 ...

Страница 6: ... 18 Opening hinges 19 Upper back housing plate 20 Back housing plate 21 Revision opening at back housing plate 22 Small pellet magazine 23 Pellet auger with motor 24 Ignitor 25 Ventilator 26 Flue tube 27 Basement 28 Adjustable legs 29 Probe 30 Safety valve 31 Fill Drain Tap 32 Flow line 33 Return line 5 ...

Страница 7: ...ing at back housing plate 22 Small pellet magazine 23 Pellet auger with motor 24 Ignitor 25 Ventilator 26 Flue tube 27 Basement 28 Adjustable legs 29 Probe 30 Safety valve 31 Fill Drain Tap 32 Flow line 33 Return Line with circulation pump 34 Expansion vessel 2 Directions for storage and transport 2 1 Delivery form Boiler is shipped with plastic protection sleeve on a pallet Boiler must be in its ...

Страница 8: ...ange Together with the boiler also the following parts are supplied Cleaning kit with an ash tray Warranty paper and this boiler manual Boiler regulation built in already Boiler cables to connect to power supply and circulation pump B 12 SET version ONLY expansion vessel circulation pump Along the boiler following parts are OBLIGATORY but NOT INCLUDED in boiler delivery Thermo manometer and the sa...

Страница 9: ...as entrusted with the mounting of the central heating system and not by the boiler manufacturer sales representative or seller 4 Safety remarks While in use some parts of the boiler may be hot Don t touch the boiler without appropriate hand protection against heat If some parts of the boiler occur to be damaged it is strictly forbidden to continue using the boiler Do not touch electrical wires wit...

Страница 10: ...ler Boiler base must be stable and made of fireproof material 5 2 Connection to the chimney Sub pressure pellet boilers require pressure difference of at least 10 3 Pa in order to ensure safe and stable combustion process This boiler requires a vertical connection for the flue gases in accordance with European norms It is essential to regularly clean the chimney at least few times a year 9 ...

Страница 11: ...ween 1 5 and 2 5 bar closed systems Air vent is to be set at the highest point of the closed central heating system If the pressure is below 1 5 bar the filling process must be repeated For open systems working pressure depends on the overall height of the system and the open expansion vessel 1 bar for each 10 m is an estimate After the filling process is done it is obligatory to close the drain t...

Страница 12: ... and operate smoothly at 2 5 bar Diameter for the aperture at the seat of the valve must be at least 15mm Connecting pipework to the boiler must be as short as possible Welds joints or any possible blockage to this pipe work must be prevented Bends in the pipe work should be avoided if possible Unavoidable bends should be of a diameter r 3D D radius of curvature and less than α 90 C The closed exp...

Страница 13: ...c air vent 2 Safety valve 3 Circulation pump separated with ball valves on each side so that it can be easily replaced if necessary Expansion vessel is on the RETURN line in this case Expansion vessel and safety valve are connected following the rules described in the previous chapters For safe operation info on additional equipment such as expansion vessel and safety valve please refer to manuals...

Страница 14: ...he valve must be installed by a qualified technician in accordance with the instructions given in the manual from the producer of the valve We recommend the CALEFFI 544501 valve depicted below 5 6 Fitting the boiler to an open central heating system The connecting scheme of an open central heating system is depicted on the figure 13 ...

Страница 15: ...RN as shown on Figure with an additional OVERFLOW pipe output plus CIRCULATION pipe to prevent freeze during winter months Please note that no additional items shall be connected to the open expansion vessel espe cially not valves The size of expansion vessel is deducted from the following equation V 0 07Vwater l Vwater l is the water volume in the entire installation Diameter for the pipework of ...

Страница 16: ...ture is too low In order to avoid it is necessary to mount the mixing valve to this boiler 1 3 end mixing valve 2 Flow line 3 Return line The purpose of this valve is to transmit a portion of the hot water to the return line cold water in order to compensate the temperature difference between the flow and return line 15 ...

Страница 17: ...ty and purity of the wood pellets used Weekly cleaning has to be performed 1 2 per week seasonal cleaning 1 3 times during the heating season However if pellets of extremely bad quality are used the cleaning frequency can change dramatically Boiler would not last long What tools do I need to clean the boiler Simple cleaning set is delivered with the boiler However ash vacuum cleaner would make thi...

Страница 18: ...ve the ash from the pot int the ash tray first then empty the ash tray CAUTION SOME PARTS MAY BE HOT Clean the area where burner pot is placed Dont forget to clean the top of the tube where resistance heater is placed When putting parts back to its place make sure the position is the same as before Otherwise boiler will not operate properly 17 ...

Страница 19: ...the screw balls that hold the plate below Clean the area inside with the ash cleaner or using manual tools When screwing back the holders screw completely so that no air can pass inside Ukoliko ne posedujetevIf no vacuum cleaner is present use the hand tools as shown below 18 ...

Страница 20: ...he boiler There are two bars coming out Now take the boiler KEY mount on the bar and move up down to release the ash from the heat exchanger tubulators Do this for both bars 6 4 Occasional seasonal cleaning Necessary equipment Gloves Ash removing vacuum cleaner OR manual cleaning set delivered with boiler Boiler KEY delivered with the boiler or fork key 13 Open the upper outter door of the boiler ...

Страница 21: ...r lifters and one screw in the middle is visible The insulation coat is attached below this metal cap To unsrew the cap use boiler KEY Put the metal cap aside make sure you make no damage to the stone wall insulation below 20 ...

Страница 22: ...KEY unscrew the upper cover of the heating chamber Lift the cover and put it on side Perform detailed cleaning of all parts that can be accessed Remove the ash The use of the ash vacuum cleaner would make this job faster and easier 21 ...

Страница 23: ...After the cleaning put back the cover and screw the holders Put everything back in its place 22 ...

Отзывы: