- when the boiler door is open, this sensor will react and stop the feeding process. There is also an
anti-explosion safety door on the side of the heating chamber.
•
Maintenance and cleaning are reduced to a minimum compared to all solid fuel boilers – only once
a week, if not less than that, with a premium quality pellet and proper use. Please note the handle
on the front side of the boiler. This is designated for occasional cleaning of the heat exchanger of
the boiler (forcing the ash to fall down to te bottom of the boiler).
2
Directions for storage and transport
2.1
Delivery form
Boiler is shipped with plastic protection sleeve on a europallet.
Boiler must be in its upright position all the time.
The rotation of the boiler during the shipment or installation represents a serious risk and
can lead to damaging the boiler.
It is forbidden to place one boiler onto another.
The boiler can be stored only in closed rooms with no atmospheric influence. The humidity
in the storing room also must not exceed the critical value of 80%, so as not to create any condensate.
The temperature of the storing room must be in the range from 0 ˚C to 40 ˚C.
When unpacking the boiler, you must check whether the paint on the boiler coating has been
scratched somewhere and whether all parts of the boiler stand in their proper position.
2.2
Delivery range
Together with the boiler, also the following parts are supplied:
•
Cleaning kit with an external ash tray
•
Warranty paper and this boiler manual
•
Boiler regulation (built-in already)
•
Tap valve (to be found below the housing on the return line)
•
Boiler cables to connect to power supply and circulation pump
Along the boiler following parts are NOT INCLUDED:
•
Thermo-manometer and the safety group
•
Mixing valve
•
Boiler valves etc.