![Termomont Temy Plus P 20 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/termomont/temy-plus-p-20/temy-plus-p-20_technical-users-manual_1089260009.webp)
2
Directions for storage and transport
2.1
Delivery form
Boiler is shipped with plastic protection sleeve on a europallet.
Boiler must be in its upright position all the time.
The rotation of the boiler during the shipment or installation represents a serious risk and
can lead to damaging the boiler.
It is forbidden to place one boiler onto another.
The boiler can be stored only in closed rooms with no atmospheric influence. The humidity
in the storing room also must not exceed the critical value of 80%, so as not to create any condensate.
The temperature of the storing room must be in the range from 0 ˚C to 40 ˚C.
When unpacking the boiler, you must check whether the paint on the boiler coating has been
scratched somewhere and whether all parts of the boiler stand in their proper position.
2.2
Delivery range
Together with the boiler, also the following parts are supplied:
•
Cleaning kit with an external ash tray
•
Warranty paper and this boiler manual
Along the boiler following parts are NOT INCLUDED:
•
Thermo-manometer and the safety group
•
Mixing valve
•
Boiler valves etc.
8
Содержание Temy Plus P 20
Страница 3: ...1 Technical data 2 ...
Страница 4: ...3 ...