RISK ASSESSMENT
QPP147
Section 1
Rev. March 07
A.
GENERAL HAZARDS
A1.
Unintended movement of plant
due to clothing getting caught
or tangled in control levers and
mechanical parts.
RISK CONTROLS & GENERAL PRECAUTIONS
A1.
When driving or operating the machine, do not wear clothing with dangling parts, which might
catch on control levers or mechanical parts. Wear a helmet, protective goggles, safety boots, a
mask, gloves and other protective gear as necessary.
A2.
Unintended movement of plant
from operating wrong controls
or errors in judgment.
A2.
Do not operate the crane when you are excessively fatigued or unwell.
Read this Instruction Manual thoroughly and familiarize yourself with all the controls before
you start operating the crane.
Follow instructions and warnings in this Manual and on the plates and stickers mounted on the
machine. If there is something you do not understand have it explained to you. If the manual
is lost or a plate is illegible replace it.
A3.
Fire and emergency response.
A3.
Carry a fire extinguisher and first aid kit in the crane. Learn how to use the fire extinguisher
before an actual emergency situation arises.
A4.
Fire from handling chemicals.
A4.
Do not smoke or use fire near fuel, oil, antifreeze, batteries or other chemicals, which could
ignite.
Extinguish all fires and potential sources of ignition when handling these flammable materials.
Before refueling the crane, switch off the engine and check that there are no fires or potential
sources of ignition nearby.
After refueling securely fasten all fuel and oil caps and wipe off any spillage.
Refuel and change oil in a well-ventilated work area.
Содержание Franna AT-15
Страница 1: ...QPP147 1 RISK ASSESSMENT...
Страница 2: ...QPP147 Inside Cover Revised Mar07 RISK ASSESSMENT...
Страница 6: ...RISK ASSESSMENT QPP147 Section 1 Rev March 07 1 GENERAL POTENTIAL HAZARDS RISK CONTROLS...
Страница 15: ...RISK ASSESSMENT QPP147 Section 2 Rev March 07 2 OPERATIONAL POTENTIAL HAZARDS RISK CONTROLS...
Страница 28: ...RISK ASSESSMENT QPP147 Section 3 Rev March 07 3 POST OPERATIONAL POTENTIAL HAZARDS AND RISK CONTROL...
Страница 30: ...RISK ASSESSMENT QPP147 Section 4 Rev March 07 4 INSPECTION AND MAINTENANCE POTENTIAL HAZARDS AND RISK CONTROL...
Страница 34: ...RISK ASSESSMENT QPP147 Appendix 1 Rev March 07 APPENDIX 1 WORKING ENVIRONMENT SITE CHECKLIST...