![Terex Franna AT-15 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/terex/franna-at-15/franna-at-15_manual_1088781014.webp)
RISK ASSESSMENT
QPP147
Section 1
Rev. March 07
C8.
Dropping of load
C8.
Check all safety and warning devices. In addition the AT-20 & MAC-25 are fitted with an
over-hoisting detector and other safety devices, which should be checked before starting work.
Carry out regular servicing of the crane in accordance with the recommendations in this
manual.
C9.
Falling objects (during erecting
and dismantling activities)
could damage property and
present a risk of injury to
workers and members of the
public.
C9.
Erect and maintain effective barricades around the mobile crane. Only allow persons who are
directly involved in erecting and dismantling activities inside the area.
Schedule the erecting and dismantling of the crane to occur when the movement of other
persons and mobile plant at the workplace is at a minimum.
Содержание Franna AT-15
Страница 1: ...QPP147 1 RISK ASSESSMENT...
Страница 2: ...QPP147 Inside Cover Revised Mar07 RISK ASSESSMENT...
Страница 6: ...RISK ASSESSMENT QPP147 Section 1 Rev March 07 1 GENERAL POTENTIAL HAZARDS RISK CONTROLS...
Страница 15: ...RISK ASSESSMENT QPP147 Section 2 Rev March 07 2 OPERATIONAL POTENTIAL HAZARDS RISK CONTROLS...
Страница 28: ...RISK ASSESSMENT QPP147 Section 3 Rev March 07 3 POST OPERATIONAL POTENTIAL HAZARDS AND RISK CONTROL...
Страница 30: ...RISK ASSESSMENT QPP147 Section 4 Rev March 07 4 INSPECTION AND MAINTENANCE POTENTIAL HAZARDS AND RISK CONTROL...
Страница 34: ...RISK ASSESSMENT QPP147 Appendix 1 Rev March 07 APPENDIX 1 WORKING ENVIRONMENT SITE CHECKLIST...