OPERATION
EN
Tennant 2550 (05--06)
7
MACHINE SETUP
INSTALLING PAD
NOTE:
Consult your authorized distributor for pad
recommendations.
Pad Specifications:
S
For 2000 RPM Burnishing.
S
25.4 mm (1 in) Thickness
S
508mm (20 in) Diameter with 89mm (3.5 in) center hole.
NOTE:
Machine is not designed for spray buffing.
1. Turn off machine and tilt machine back on rear
wheels.
FOR SAFETY: Before leaving or servicing
machine, stop on level surface, turn off machine
and set parking brake.
NOTE:
When machine is tilted back completely, power
to pad motor automatically shuts off.
Tilt Machine back to Install Pad
ATTENTION: Do not leave machine tilted back for
an extended time, battery acid may leak.
2. Remove the plastic centerlock from pad driver by
squeezing the retainer clip on the centerlock
3. Position pad centered on pad driver and replace
centerlock securely.
Installing Pad
ATTENTION: Do not operate machine without a
pad and/or centerlock in place.
4. After installing pad, return machine to operating
position.
INSTALLING DUST CONTROL BAG
1. Open dust control bag compartment at front of
machine.
2. Slide bag on plastic snout. Close compartment.
Installing Dust Control Bag
3. Empty or replace bag daily. Do not allow bag to fill
beyond half full.
ADJUSTING CONTROL GRIP HEIGHT
The machine has three control grip height settings.
1. Locate two spring loaded levers below console.
2. Squeeze levers together and lift or lower control
grips to a comfortable operating height.
Adjusting Control Grip Height