OPERATION
10
Tennant 2370 (12--08)
MACHINE COMPONENTS
1
4
9
12
5
2
3
6
7
8
10
11
13
1. Adjustable Control Handle
2. Handle Height Adjustment lever
3. Safety Lock Buttons
4. On/Off Levers
5. 23 M (75’) Power Cord
6. Quick Release Power Cord Storing Hook
7. Transport Wheels
8. Dust Bag Housing
9. Pad Pressure Adjustment Knob
10. Pad Pressure Meter
11. Circuit Breaker Reset Button
12. Base
13. Dust Control Skirt
MACHINE SETUP
Carefully check carton for signs of damage. Report
damages at once to carrier.
INSTALLING PAD
1. Unplug the cord from the wall outlet.
FOR SAFETY: Before leaving or servicing
machine, unplug cord from wall outlet.
2. Select and install a recommended pad that best
meets your burnishing needs.
NOTE:
Consult your authorized distributor for pad
recommendations. Use only manufacturer supplied or
approved pads.
NOTE: Machine is not designed for spray buffing.
3. Pull the handle height adjustment lever and raise
the handle to the upright position. Carefully tilt the
machine backwards and rest the handle on the
floor (Figure 1).
FIG. 1
4. Remove the plastic centerlock ring from the pad
driver. Position the pad on the pad driver and
replace the ring securely by turning it clockwise
(Figure 2).
FIG. 2
5. After installing pad, return the machine to the
upright position.