MAINTENANCE
1465/1480/1490 MM185 (9–90)
3Ć4
MAINTENANCE CHART
1
2
3
3
4
5
6
7
7
8
14
14
10
10
11
12
13
9
5
6
15
04354
Interval
Key
Description
Procedure
Lubricant/
Fluid
No. of
Service
Points
Daily
1
Squeegee
Check for damage and wear
–
1
10
Scrub brushes
Check for damage and wear
–
2
4
Recovery tank
Clean Back flush squeegee suc-
tion hose
–
1
15
ES
solution tank
Clean and flush
–
1
11
Pre-Sweep
brush
Check for damage and wear
–
1
25 Hours
9
Scrub head floor skirts
Check for damage and wear
–
3
1
Squeegee
Check deflection
–
1
7
Front tires
Check air pressure
–
2
11
Pre-Sweep
Check skirts and seals for dam-
age and wear
–
6
80 Hours
14
Scrub head side skirts
Check for adjustment
–
2
12
Pre-Sweep
brush drive
belt
Check tension
–
1
11
Pre-Sweep
side skirts
Check floor clearance
–
2
100 Hours
3
Rear casters
Lubricate
SPL
2
2
Parking brake
Check adjustment
–
1
5
Wheel drive chains
Lubricate
SPL
2
160 Hours
8
Vacuum fan motor
Check motor brushes
–
1
10
Scrub brush motors
Check motor brushes
–
2
6
Propelling motors
Check motor brushes
–
2
13
Pre-Sweep
brush motor
Check motor brushes
–
1
SPL – Special lubricant, Lubriplate EMB grease (TENNANT part no. 01433–1)
NOTE: More frequent intervals may be required in extremely dusty applications.
Содержание 1465
Страница 1: ...1465 1480 1490 MM185 Rev 11 9 94 ...
Страница 10: ...SPECIFICATIONS 1465 1485 1490 MM185 9 90 1Ć2 ...
Страница 18: ...OPERATION 1465 1480 1490 MM185 9 90 2 2 ...
Страница 42: ...MAINTENANCE 1465 1480 1490 MM185 9 90 3Ć2 ...
Страница 49: ...MAINTENANCE 3Ć9 1465 1480 1490MM185 11 92 05097 ELECTRICAL SCHEMATIC ...
Страница 68: ...APPENDIX 1465 1480 1490 MM185 9 90 4Ć2 ...
Страница 70: ...APPENDIX 1465 1480 1490MM185 9 90 4Ć4 ...