background image

                                                                                           4

8.

Assemble the 

Snap Switch 

to the handset hanger using the 2-56 x 7/16” long screws and nuts so the switch button faces out. 

See Figure 5.

9.

After assembling the switch

 

to the hanger, super glue the 

nuts

 to the switch housing. 

NOTE:

Take care not to get glue on the screw threads. This allows the switch placement to be adjusted after it is assembled on the 

case side. After the glue dries, verify the screws can be loosened and tightened without the nuts moving before proceeding.
The speaker may have to be removed to install the hanger return spring.

10.

Inside the case top, assemble the 

Hanger Return Spring

 to the standoffs using the 1/4” long screws. 

The spring must be installed so the open slots face away from the keypads and toward the bottom edge of the case top. See Figure 6

FIGURE 5.

Assembling Snap Switch to Handset Hanger

FIGURE 6.

Hanger Return Spring

Содержание C-6200

Страница 1: ... black rubber plugs fill the handset mounting holes Older units require mounting holes to be drilled For more information see IP 1616 C 6200 Drilling Instructions if holes are required To remove the unit s case top do the following 1 Remove the screws attaching the top case to the unit 2 With the unit s left side facing forward remove the top and place it to the right back of the unit 3 Remove the...

Страница 2: ...arts are present See Figure 2 NOTE When drilling holes items 9 10 and 12 are used to mount the Hanger Return Spring Item 13 is not used The Washer and Spacer both go on the inside of the case If installing in a case with predrilled holes items 9 10 and 12 are not required FIGURE 2 Option Kit Parts ...

Страница 3: ...e top so the connector is on the inside of the case See Figure 3 FIGURE 3 Inserting Cable through Case Top 6 Solder one lead to pin 1 7 Solder the other lead to pin 3 See Figure 4 NOTE Pin numbers are on the side of the switch FIGURE 4 Lead Placement ...

Страница 4: ...ter it is assembled on the case side After the glue dries verify the screws can be loosened and tightened without the nuts moving before proceeding The speaker may have to be removed to install the hanger return spring 10 Inside the case top assemble the Hanger Return Spring to the standoffs using the 1 4 long screws The spring must be installed so the open slots face away from the keypads and tow...

Страница 5: ...ff 3 Secure the hanger to the standoff with the 5 8 long screws See Figure 7 4 Plug the switch cable connector into the PCBA On the IP 1616 connect to J10 On the C6200 connect to J80 See Figure 8 NOTE The cable may be short which may require partially placing the case top on the unit as the switch cable connector is plugged into the PCBA FIGURE 7 Securing Hanger to the Standoff FIGURE 8 IP 1616 an...

Страница 6: ... require handset mounting holes to be drilled IP 1616 C 6200 Drilling Instructions To drill handset mounting holes into the IP 1616 C 6200 case top do the following 1 Remove the screws holding the case top to the unit and position the case top to allow the right side of the case to be drilled 2 Go to http www telex com US dispatch downloads to download the drill template needed from the Drawings s...

Отзывы: