Telemark TT-6 Power Supply
OPERATION
Introduction
This section describes the normal operating procedures for the Telemark TT
Power Supplies.
Preliminary Precautions
Before turning on the system for the first time, it is essential that the following
conditions are observed:
1 The ground system is correctly installed as described in detail
in Chapter 3 (Installation), System Grounding Practice.
2
The external interlocks are correctly installed as described in
detail in Chapter 3, Interlock Connections, page 3-5.
3
The vacuum tank is operational.
4
The filament assembly is assembled to specifications and not
shorted to ground, and the E-beam gun has material in its
crucible.
Power Supply Startup
1 Turn on primary AC POWER circuit breaker.
Note: Allow two minutes for the unit to warm up before
proceeding.
2
Observe the interlock lights. All should be on. If any of
these lights are not illuminated, Source Emission Adjust must
OPERATION
5-1