08354B DCN7877
Teledyne API T640 PM Mass Monitor
25
INLET INSTALLATION
1. To complete the installation now will depend on whether the instrument is being
installed in an Outdoor Enclosure or Walk-in Shelter. If performing testing in a
laboratory, you can proceed with attaching the inlet.
2. For the T640, assemble the inlet and the ASC as depicted below (Figure 2-13.
T640 Sample Head (5-LPM) and ASC Assembly).
Figure 2-13. T640 Sample Head (5-LPM) and ASC Assembly