Section 8 Maintenance
8-13
3. Connect the 1/8" PTFE tubing into the push-to-connect
fitting labeled as 'Neb Gas'.
4. Finger-tighten the 10-32 PEEK fitting.
5. Connect the high voltage connector.
8.6.3 APCI Probe Removal
Refer to Figure 8-8 for procedure illustration.
1. Disconnect the high voltage connector by pulling straight
up (do not twist).
2. Unscrew the 10-32 PEEK fitting from the probe inlet.
3. Disconnect the 1/8" PTFE tubing from the push-to-connect
fitting labeled as 'Neb Gas'.
4. Disconnect the 1/8" PTFE tubing from the push-to-connect
fitting labeled as 'APCI heated gas'.
5. Loosen the thumbscrew on the front of the ion source
housing.
6. Carefully lift and pull out the APCI probe from the source
chamber.
7. If changing to ESI, remove the corona discharge pin (see
removing the ionization source chamber section).
Figure 8-8 Removing the APCI probe
1
2
3
5
4
6
7
Содержание CombiFlash EZ Prep
Страница 2: ...CombiFlash Rf User Manual ii ...
Страница 8: ...CombiFlash Rf User Manual viii ...
Страница 52: ...CombiFlash Rf User Manual 2 16 Figure 2 7 Loading test tubes ...
Страница 85: ...CombiFlash Rf User Manual 3 20 ...
Страница 103: ...CombiFlash Rf User Manual 4 18 ...
Страница 185: ...CombiFlash Rf User Manual 6 64 ...
Страница 195: ...CombiFlash Rf User Manual 7 10 Figure 7 4 Local Area Connection Properties Figure 7 5 Alternate Configuration Settings ...
Страница 199: ...CombiFlash Rf User Manual 7 14 ...
Страница 223: ...CombiFlash Rf User Manual 8 24 ...
Страница 225: ......
Страница 227: ......
Страница 229: ......
Страница 231: ......
Страница 233: ......
Страница 235: ......
Страница 237: ......