Oxygen Analyzer
Installation
Teledyne Analytical Instruments
31
Figure 3-1: Model BDS 3960 Front Panel
Access to the electronics, the sensor, and sampling system is
accomplished by loosening the thumbscrews on the front of the
analyzer. The whole assembly will slide out toward the front. Allow
clearance for the assembly to slide out when maintenance is required.
Leave clearance of about 20 inches so that whole assembly can be pulled
out of its case. See Figure 3-2.
Figure 3-2: Required Assembly Drawer Clearance
20 inch
clearanc
Содержание BDS-3960
Страница 17: ...Oxygen Analyzer Introduction Teledyne Analytical Instruments 17 Figure 1 2 Model BDS 3960 Rear Panel...
Страница 29: ...Oxygen Analyzer Operational Theory Teledyne Analytical Instruments 29...
Страница 64: ...Maintenance BDS 3960 Teledyne Analytical Instruments 64 Figure 5 3 Vacuum Degassing for the BDS Oxygen Sensor...
Страница 65: ...Oxygen Analyzer Maintenance Teledyne Analytical Instruments 65...