3-7
Trace Oxygen Analyzer
Installation 3
Teledyne Analytical Instruments
Figure 3-5: Piping Diagram for Vacuum Service Option
3.5
Installation Checklist
Before connecting the instrument to the power source and turning it on,
make sure you have:
•
Correctly installed the Sample and Exhaust gas lines
•
Checked for leaks
•
Set the sample pressure to 5–10 psig (34.5 - 68.9 kpa), nominal
(for non-vacuum service units)
•
Set the flow
Once the above checks have been made, you can connect to the power
source. The instrument is now ready for operation.
Customer Supplied Parts